If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485050408020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.109941,"lon":-114.687958,"icon":""}]} |
Location: 02/08-04-048-05W5/0 | |
Location Alias: 02/08-04-48-05 W5M | |
Location Alias 2: 02/08-04-048-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 05 | |
Section: 04 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 102 HZ PEMBINA 8-4-48-5 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0487551 | |
License Date: 2018-01-05 | |
License Status: Issued | |
Spud Date: 2018-01-11 | |
Final Drill Date: 2018-01-16 | |
Well Total Depth: 3130.00 m | |
Surface Hole Latitude: 53.109941 | |
Surface Hole Longitude: -114.687958 |
Date | Event |
---|---|
2018-01-05 | Obtained License |
2018-01-12 | Surface Casing Operation Performed |
2018-01-13 | Direction Drilling Operation Performed - Deviate |
2018-01-14 | Direction Drilling Operation Performed - Horizontal |
2018-01-16 | Finished Drilling |
2018-01-16 | Well Mode changed to Drilled and Cased |
2018-01-17 | Well Log Performed |
2018-01-18 | Production Casing Operation Performed |
2018-01-18 | Rig Released |
2018-02-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-01 | Well Began Production |
2018-03-01 | Well Fluid changed to Crude Oil |
2018-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-11 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-13 | 1147.90 | Deviate (5 - 79 degrees) |
2018-01-14 | 1523.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-11 | Multi-Stage Fracture | 3115.90 | 3116.50 | 0 |
2018-02-11 | Multi-Stage Fracture | 2665.70 | 2667.60 | 0 |
2018-02-11 | Multi-Stage Fracture | 2614.90 | 2616.80 | 0 |
2018-02-11 | Multi-Stage Fracture | 2564.90 | 2566.80 | 0 |
2018-02-12 | Multi-Stage Fracture | 2514.50 | 2516.50 | 0 |
2018-02-12 | Multi-Stage Fracture | 2463.80 | 2465.70 | 0 |
2018-02-12 | Multi-Stage Fracture | 2414.20 | 2416.10 | 0 |
2018-02-12 | Multi-Stage Fracture | 2363.90 | 2365.90 | 0 |
2018-02-12 | Multi-Stage Fracture | 2314.30 | 2316.20 | 0 |
2018-02-12 | Multi-Stage Fracture | 2265.00 | 2266.90 | 0 |
2018-02-12 | Multi-Stage Fracture | 2215.30 | 2217.20 | 0 |
2018-02-11 | Multi-Stage Fracture | 3067.50 | 3069.40 | 0 |
2018-02-12 | Multi-Stage Fracture | 2164.90 | 2166.80 | 0 |
2018-02-12 | Multi-Stage Fracture | 2114.50 | 2116.40 | 0 |
2018-02-12 | Multi-Stage Fracture | 2064.10 | 2066.00 | 0 |
2018-02-12 | Multi-Stage Fracture | 2013.90 | 2015.80 | 0 |
2018-02-12 | Multi-Stage Fracture | 1963.70 | 1965.60 | 0 |
2018-02-12 | Multi-Stage Fracture | 1913.20 | 1915.10 | 0 |
2018-02-12 | Multi-Stage Fracture | 1862.70 | 1864.60 | 0 |
2018-02-12 | Multi-Stage Fracture | 1812.30 | 1814.20 | 0 |
2018-02-12 | Multi-Stage Fracture | 1762.50 | 1764.40 | 0 |
2018-02-12 | Multi-Stage Fracture | 1711.90 | 1713.90 | 0 |
2018-02-11 | Multi-Stage Fracture | 3017.10 | 3019.00 | 0 |
2018-02-12 | Multi-Stage Fracture | 1661.80 | 1663.70 | 0 |
2018-02-12 | Multi-Stage Fracture | 1612.00 | 1613.90 | 0 |
2018-02-12 | Multi-Stage Fracture | 1561.70 | 1563.60 | 0 |
2018-02-11 | Multi-Stage Fracture | 2967.00 | 2968.90 | 0 |
2018-02-11 | Multi-Stage Fracture | 2917.10 | 2919.00 | 0 |
2018-02-11 | Multi-Stage Fracture | 2867.10 | 2869.00 | 0 |
2018-02-11 | Multi-Stage Fracture | 2816.30 | 2818.20 | 0 |
2018-02-11 | Multi-Stage Fracture | 2765.90 | 2767.80 | 0 |
2018-02-11 | Multi-Stage Fracture | 2716.00 | 2717.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-11 | 2018-02-12 | 1,409 | 2,794 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.9999 | N/A | |||
Sand - Tier 2 (20/40) | Trican Well Service | Aluminum Oxide | 1344-28-1 | 100 | 9.7965 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 9.7965 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 9.7965 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 9.7965 | N/A | ||||
Sand - Tier 2 (30/50) | Trican Well Service | Aluminum Oxide | 1344-28-1 | 100 | 4.9875 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.9875 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.9875 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.9876 | N/A | ||||
NMR-1 (Stimulation Surfactant) | Trican Well Service | Acid | methanol | 67-56-1 | 100 | 0.0442 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0442 | N/A | ||||
AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0217 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0217 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0217 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0217 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0217 | N/A | ||||
CC-7 (Clay Stabilizer) | Trican Well Service | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0975 | N/A | |
water | Not Available | 100 | 0.0975 | N/A | ||||
FR-22 (Friction Reducer) | Trican Well Service | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0523 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0523 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0523 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-10 | 2018-02-11 | Surface Water - Runoff | 2097 |
2018-02-13 | 2018-02-14 | Surface Water - Runoff | 744 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6974 | 0.0 | 0.0 | 0.0 |
2019 | 8512 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-18 | No Incident Encountered | 0.00 | 0.00 |
2018-02-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]