If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485050401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.109941,"lon":-114.688107,"icon":""}]} |
Location: 00/01-04-048-05W5/0 | |
Location Alias: 00/01-04-48-05 W5M | |
Location Alias 2: 00/01-04-048-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 05 | |
Section: 04 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA HZ PEMBINA 1-4-48-5 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0487552 | |
License Date: 2018-01-05 | |
License Status: Issued | |
Spud Date: 2018-01-18 | |
Final Drill Date: 2018-01-23 | |
Well Total Depth: 3172.00 m | |
Surface Hole Latitude: 53.109941 | |
Surface Hole Longitude: -114.688107 |
Date | Event |
---|---|
2018-01-05 | Obtained License |
2018-01-19 | Surface Casing Operation Performed |
2018-01-20 | Direction Drilling Operation Performed - Deviate |
2018-01-21 | Direction Drilling Operation Performed - Horizontal |
2018-01-23 | Finished Drilling |
2018-01-23 | Well Log Performed |
2018-01-23 | Well Mode changed to Drilled and Cased |
2018-01-24 | Production Casing Operation Performed |
2018-01-24 | Rig Released |
2018-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-01 | Well Began Production |
2018-03-01 | Well Fluid changed to Crude Oil |
2018-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-18 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-20 | 1147.20 | Deviate (5 - 79 degrees) |
2018-01-21 | 1579.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-13 | Multi-Stage Fracture | 3159.10 | 3159.60 | 0 |
2018-02-13 | Multi-Stage Fracture | 2719.00 | 2720.90 | 0 |
2018-02-13 | Multi-Stage Fracture | 2670.40 | 2672.30 | 0 |
2018-02-13 | Multi-Stage Fracture | 2622.50 | 2624.40 | 0 |
2018-02-13 | Multi-Stage Fracture | 2574.10 | 2576.00 | 0 |
2018-02-13 | Multi-Stage Fracture | 2525.50 | 2527.40 | 0 |
2018-02-13 | Multi-Stage Fracture | 2476.70 | 2478.60 | 0 |
2018-02-13 | Multi-Stage Fracture | 2426.50 | 2428.40 | 0 |
2018-02-13 | Multi-Stage Fracture | 2378.00 | 2379.90 | 0 |
2018-02-13 | Multi-Stage Fracture | 2329.00 | 2330.90 | 0 |
2018-02-13 | Multi-Stage Fracture | 2279.00 | 2280.90 | 0 |
2018-02-13 | Multi-Stage Fracture | 3111.30 | 3113.30 | 0 |
2018-02-13 | Multi-Stage Fracture | 2230.70 | 2232.60 | 0 |
2018-02-13 | Multi-Stage Fracture | 2181.00 | 2182.90 | 0 |
2018-02-13 | Multi-Stage Fracture | 2131.40 | 2133.30 | 0 |
2018-02-13 | Multi-Stage Fracture | 2081.20 | 2083.10 | 0 |
2018-02-14 | Multi-Stage Fracture | 2031.70 | 2033.60 | 0 |
2018-02-14 | Multi-Stage Fracture | 1982.70 | 1984.60 | 0 |
2018-02-14 | Multi-Stage Fracture | 1934.90 | 1936.80 | 0 |
2018-02-14 | Multi-Stage Fracture | 1886.60 | 1888.50 | 0 |
2018-02-14 | Multi-Stage Fracture | 1837.40 | 1839.40 | 0 |
2018-02-14 | Multi-Stage Fracture | 1788.40 | 1790.30 | 0 |
2018-02-13 | Multi-Stage Fracture | 3062.60 | 3064.50 | 0 |
2018-02-14 | Multi-Stage Fracture | 1738.70 | 1740.80 | 0 |
2018-02-14 | Multi-Stage Fracture | 1689.20 | 1691.10 | 0 |
2018-02-14 | Multi-Stage Fracture | 1639.90 | 1641.80 | 0 |
2018-02-14 | Multi-Stage Fracture | 1590.80 | 1592.70 | 0 |
2018-02-13 | Multi-Stage Fracture | 3013.40 | 3015.30 | 0 |
2018-02-13 | Multi-Stage Fracture | 2963.90 | 2965.80 | 0 |
2018-02-13 | Multi-Stage Fracture | 2915.40 | 2917.30 | 0 |
2018-02-13 | Multi-Stage Fracture | 2866.60 | 2868.60 | 0 |
2018-02-13 | Multi-Stage Fracture | 2817.40 | 2819.30 | 0 |
2018-02-13 | Multi-Stage Fracture | 2767.90 | 2769.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-13 | 2018-02-14 | 1,410 | 2,793 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.6288 | N/A | |||
Sand - Tier 2 (20/40) | Trican Well Service | Aluminum Oxide | 1344-28-1 | 100 | 10.1243 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 10.1243 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 10.1243 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 10.1243 | N/A | ||||
Sand - Tier 2 (30/50) | Trican Well Service | Aluminum Oxide | 1344-28-1 | 100 | 5.0621 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.0621 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.0621 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.062 | N/A | ||||
NMR-1 (Stimulation Surfactant) | Trican Well Service | Acid | methanol | 67-56-1 | 100 | 0.0249 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0249 | N/A | ||||
AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0245 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0245 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0245 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0245 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0245 | N/A | ||||
WBO-2 (Breaker Oxidizer) | Trican Well Service | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0006 | N/A | |
CC-7 (Clay Stabilizer) | Trican Well Service | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0874 | N/A | |
water | Not Available | 100 | 0.0874 | N/A | ||||
FR-22 (Friction Reducer) | Trican Well Service | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.047 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.047 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.047 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-13 | 2018-02-14 | Surface Water - Runoff | 2673 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 7100 | 0.0 | 0.0 | 0.0 |
2019 | 8500 | 0.0 | 0.0 | 0.0 |
2020 | 2149 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-24 | No Incident Encountered | 0.00 | 0.00 |
2018-02-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]