X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485050315000

Well Details

Well ID: 0485050315000
Loading map...
Location: 00/15-03-048-05W5/0
Location Alias: 00/15-03-48-05 W5M
Location Alias 2: 00/15-03-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 03
County/Municipality: Brazeau County
Well Name: SINOPEC HZ PEMBINA 15-3-48-5
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0464255
License Date: 2014-01-22
License Status: Issued
Spud Date: 2014-02-18
Final Drill Date: 2014-02-22
Well Total Depth: 3049.00 m
Surface Hole Latitude: 53.103252
Surface Hole Longitude: -114.642438

For data sources see[1][2]

Well History

Date Event
2014-01-22 Obtained License
2014-02-18 Surface Casing Operation Performed
2014-02-19 Direction Drilling Operation Performed - Deviate
2014-02-20 Direction Drilling Operation Performed - Horizontal
2014-02-20 Well Log Performed
2014-02-22 Finished Drilling
2014-02-22 Well Log Performed
2014-02-22 Well Mode changed to Drilled and Cased
2014-02-23 Well Log Performed
2014-02-24 Production Casing Operation Performed
2014-02-24 Rig Released
2014-03-10 Well Log Performed
2014-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-22 Perforation Treatment Performed - Open-Hole Completion
2014-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-27 Well Began Production
2014-03-27 Well Fluid changed to Crude Oil
2014-03-27 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-02-18 Ensign Drilling Inc. 54 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-19 1012.00 Deviate (5 - 79 degrees)
2014-02-20 1555.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-22 Open Hole/Barefoot Completion 3044.00 3049.00 0
2014-03-22 Multi-Stage Fracture 2544.70 2544.90 0
2014-03-22 Multi-Stage Fracture 2482.80 2483.00 0
2014-03-22 Multi-Stage Fracture 2421.00 2421.20 0
2014-03-22 Multi-Stage Fracture 2370.70 2370.90 0
2014-03-22 Multi-Stage Fracture 2308.60 2308.80 0
2014-03-22 Multi-Stage Fracture 2246.60 2246.80 0
2014-03-23 Multi-Stage Fracture 2184.80 2185.00 0
2014-03-23 Multi-Stage Fracture 2122.80 2123.00 0
2014-03-23 Multi-Stage Fracture 2072.70 2072.90 0
2014-03-23 Multi-Stage Fracture 2010.60 2010.80 0
2014-03-22 Multi-Stage Fracture 3021.30 3021.50 0
2014-03-23 Multi-Stage Fracture 1948.70 1948.90 0
2014-03-23 Multi-Stage Fracture 1886.70 1886.90 0
2014-03-23 Multi-Stage Fracture 1824.70 1824.90 0
2014-03-23 Multi-Stage Fracture 1774.20 1774.40 0
2014-03-23 Multi-Stage Fracture 1712.10 1712.30 0
2014-03-23 Multi-Stage Fracture 1650.30 1650.50 0
2014-03-23 Multi-Stage Fracture 1588.30 1588.50 0
2014-03-22 Multi-Stage Fracture 2964.40 2964.60 0
2014-03-22 Multi-Stage Fracture 2902.60 2902.80 0
2014-03-22 Multi-Stage Fracture 2841.90 2842.10 0
2014-03-22 Multi-Stage Fracture 2780.80 2781.00 0
2014-03-22 Multi-Stage Fracture 2718.80 2719.00 0
2014-03-22 Multi-Stage Fracture 2657.00 2657.20 0
2014-03-22 Multi-Stage Fracture 2606.50 2606.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-22 2014-03-23 1,381 2,632 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 80.7706 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 13.2457 N/A
Crystalline silica. quartz 14808-60-7 100 13.2457 N/A
Iron Oxide 1309-37-1 100 13.2457 N/A
Titanium Oxide 13463-67-7 100 13.2456 N/A
SiberProp FC (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 2.3374 N/A
Phenol formaldehyde resin 9003-35-4 100 2.3374 N/A
AcResin Activator W Canyon Activator Alcohols. C12-14 Secondary. Ethoxylated 84133-50-6 100 0.0276 N/A
Methyl Alcohol 67-56-1 100 0.0276 N/A
Polyethylene Glycol 25322-68-3 100 0.0276 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0487 N/A
Water 7732-18-5 100 0.0487 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0909 N/A
Water 7732-18-5 100 0.0909 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 3.3552 N/A
Non-hazardous base ingredient(s) Not Available 100 3.3552 N/A
CAN-2057 Friction Reducer Canyon Friction Reducer No hazardous ingredients Not Available 100 0.0448 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0786 N/A
Water 7732-18-5 100 0.0786 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-11 2014-03-14 Central Water Distribution Facility 2662

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6276 0.0 0.0 0.0
2015 8523 0.0 0.0 0.0
2016 8562 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8507 0.0 0.0 0.0
2019 8606 0.0 0.0 0.0
2020 1967 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-24 No Incident Encountered 0.00 0.00
2014-04-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References