If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485041805000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.142435,"lon":-114.557681,"icon":""}]} |
Location: 00/05-18-048-04W5/0 | |
Location Alias: 00/05-18-48-04 W5M | |
Location Alias 2: 00/05-18-048-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 04 | |
Section: 18 | |
County/Municipality: Brazeau County | |
Well Name: RIDGEBACK PEMBINA 5-18-48-4 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0446827 | |
License Date: 2012-06-26 | |
License Status: Amended | |
Spud Date: 2012-08-10 | |
Final Drill Date: 2012-08-17 | |
Well Total Depth: 3021.00 m | |
Surface Hole Latitude: 53.142435 | |
Surface Hole Longitude: -114.557681 |
Date | Event |
---|---|
2012-06-26 | Obtained License |
2012-08-11 | Kick Occurred |
2012-08-11 | Surface Casing Operation Performed |
2012-08-13 | Direction Drilling Operation Performed - Deviate |
2012-08-14 | Direction Drilling Operation Performed - Horizontal |
2012-08-17 | Finished Drilling |
2012-08-17 | Well Log Performed |
2012-08-17 | Well Mode changed to Drilled and Cased |
2012-08-18 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-18 | Production Casing Operation Performed |
2012-08-18 | Rig Released |
2012-08-26 | Well Log Performed |
2012-09-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-12 | Well Began Production |
2012-09-12 | Well Fluid changed to Crude Oil |
2012-09-12 | Well Mode changed to Flowing |
2012-09-14 | Well Log Performed |
2014-12-01 | Well Fluid changed to Crude Oil |
2014-12-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-10 | Champion Drilling Inc. | 360 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-13 | 875.00 | Deviate (5 - 79 degrees) |
2012-08-14 | 1531.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-18 | Open Hole/Barefoot Completion | 3016.00 | 3021.00 | 0 |
2012-09-10 | Multi-Stage Fracture | 2450.80 | 2450.90 | 0 |
2012-09-10 | Multi-Stage Fracture | 2374.90 | 2375.00 | 0 |
2012-09-10 | Multi-Stage Fracture | 2313.70 | 2313.80 | 0 |
2012-09-10 | Multi-Stage Fracture | 2238.70 | 2238.80 | 0 |
2012-09-10 | Multi-Stage Fracture | 2178.70 | 2178.80 | 0 |
2012-09-11 | Multi-Stage Fracture | 2103.90 | 2104.00 | 0 |
2012-09-11 | Multi-Stage Fracture | 2043.60 | 2043.70 | 0 |
2012-09-11 | Multi-Stage Fracture | 1967.30 | 1967.40 | 0 |
2012-09-11 | Multi-Stage Fracture | 1906.10 | 1906.20 | 0 |
2012-09-11 | Multi-Stage Fracture | 1829.80 | 1829.90 | 0 |
2012-09-10 | Multi-Stage Fracture | 2990.30 | 2990.40 | 0 |
2012-09-11 | Multi-Stage Fracture | 1768.30 | 1768.40 | 0 |
2012-09-11 | Multi-Stage Fracture | 1694.50 | 1694.60 | 0 |
2012-09-10 | Multi-Stage Fracture | 2922.30 | 2922.40 | 0 |
2012-09-10 | Multi-Stage Fracture | 2861.10 | 2861.20 | 0 |
2012-09-10 | Multi-Stage Fracture | 2785.30 | 2785.40 | 0 |
2012-09-10 | Multi-Stage Fracture | 2723.50 | 2723.60 | 0 |
2012-09-10 | Multi-Stage Fracture | 2647.60 | 2647.70 | 0 |
2012-09-10 | Multi-Stage Fracture | 2587.10 | 2587.20 | 0 |
2012-09-10 | Multi-Stage Fracture | 2511.40 | 2511.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 297 | 0.0 | 0.0 | 0.0 |
2013 | 8472 | 0.0 | 0.0 | 0.0 |
2014 | 8409 | 0.0 | 0.0 | 0.0 |
2015 | 8154 | 0.0 | 0.0 | 0.0 |
2016 | 8754 | 0.0 | 0.0 | 0.0 |
2017 | 8245 | 0.0 | 0.0 | 0.0 |
2018 | 8418 | 0.0 | 0.0 | 0.0 |
2019 | 8267 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-11 | Kick | 58.00 | 58.00 |
2012-09-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]