X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485041109020

Well Details

Well ID: 0485041109020
Loading map...
Location: 02/09-11-048-04W5/0
Location Alias: 02/09-11-48-04 W5M
Location Alias 2: 02/09-11-048-04 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 04
Section: 11
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 9-11-48-4
Operator Name: Bonterra Energy Corp.
License Number: 0487878
License Date: 2018-01-29
License Status: Issued
Spud Date: 2018-02-18
Final Drill Date: 2018-02-22
Well Total Depth: 3024.00 m
Surface Hole Latitude: 53.123512
Surface Hole Longitude: -114.491993

For data sources see[1][2]

Well History

Date Event
2018-01-29 Obtained License
2018-02-19 Direction Drilling Operation Performed - Deviate
2018-02-19 Surface Casing Operation Performed
2018-02-20 Direction Drilling Operation Performed - Horizontal
2018-02-22 Finished Drilling
2018-02-22 Well Log Performed
2018-02-22 Well Mode changed to Drilled and Cased
2018-02-23 Production Casing Operation Performed
2018-02-23 Rig Released
2018-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-21 Well Began Production
2018-03-21 Well Fluid changed to Crude Oil
2018-03-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-18 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-19 729.40 Deviate (5 - 79 degrees)
2018-02-20 1587.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-11 Multi-Stage Fracture 3005.80 3006.40 0
2018-03-11 Multi-Stage Fracture 2603.50 2605.40 0
2018-03-11 Multi-Stage Fracture 2558.40 2560.30 0
2018-03-11 Multi-Stage Fracture 2513.40 2515.30 0
2018-03-11 Multi-Stage Fracture 2468.30 2470.20 0
2018-03-11 Multi-Stage Fracture 2423.10 2425.00 0
2018-03-11 Multi-Stage Fracture 2378.50 2380.50 0
2018-03-11 Multi-Stage Fracture 2334.40 2336.30 0
2018-03-11 Multi-Stage Fracture 2289.60 2291.50 0
2018-03-11 Multi-Stage Fracture 2245.30 2247.20 0
2018-03-11 Multi-Stage Fracture 2201.40 2203.30 0
2018-03-11 Multi-Stage Fracture 2962.60 2964.50 0
2018-03-11 Multi-Stage Fracture 2156.20 2158.10 0
2018-03-11 Multi-Stage Fracture 2111.00 2112.90 0
2018-03-11 Multi-Stage Fracture 2066.00 2067.90 0
2018-03-11 Multi-Stage Fracture 2021.40 2023.30 0
2018-03-11 Multi-Stage Fracture 1976.40 1978.30 0
2018-03-11 Multi-Stage Fracture 1931.40 1933.30 0
2018-03-11 Multi-Stage Fracture 1886.40 1888.30 0
2018-03-11 Multi-Stage Fracture 1842.00 1843.90 0
2018-03-11 Multi-Stage Fracture 1796.80 1798.70 0
2018-03-11 Multi-Stage Fracture 1751.90 1753.80 0
2018-03-11 Multi-Stage Fracture 2917.60 2919.50 0
2018-03-11 Multi-Stage Fracture 1706.70 1708.70 0
2018-03-11 Multi-Stage Fracture 1662.60 1664.50 0
2018-03-11 Multi-Stage Fracture 1617.40 1619.30 0
2018-03-11 Multi-Stage Fracture 2872.60 2874.50 0
2018-03-11 Multi-Stage Fracture 2827.80 2829.70 0
2018-03-11 Multi-Stage Fracture 2782.50 2784.40 0
2018-03-11 Multi-Stage Fracture 2737.70 2739.60 0
2018-03-11 Multi-Stage Fracture 2692.80 2694.70 0
2018-03-11 Multi-Stage Fracture 2648.40 2650.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-11 2018-03-11 1,306 2,610 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.2129 N/A
Sand - Tier 2 (20/40) Trican Well Service Aluminum Oxide 1344-28-1 100 10.3775 N/A
Crystalline silica. quartz 14808-60-7 100 10.3775 N/A
Iron Oxide 1309-37-1 100 10.3775 N/A
Titanium Oxide 13463-67-7 100 10.3775 N/A
Sand - Tier 2 (30/50) Trican Well Service Aluminum Oxide 1344-28-1 100 5.2024 N/A
Crystalline silica. quartz 14808-60-7 100 5.2024 N/A
Iron Oxide 1309-37-1 100 5.2024 N/A
Titanium Oxide 13463-67-7 100 5.2023 N/A
NMR-1 (Stimulation Surfactant) Trican Well Service Acid methanol 67-56-1 100 0.0455 N/A
non-hazardous ingredients Not Available 100 0.0455 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0211 N/A
2-mercaptoethanol 60-24-2 100 0.0211 N/A
dibromoacetonitrile 3252-43-5 100 0.0211 N/A
non-hazardous ingredients Not Available 100 0.0211 N/A
sodium bromide 7647-15-6 100 0.0211 N/A
CC-7 (Clay Stabilizer) Trican Well Service Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0916 N/A
water Not Available 100 0.0916 N/A
FR-22 (Friction Reducer) Trican Well Service Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0486 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0486 N/A
non-hazardous ingredients Not Available 100 0.0486 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-10 2018-03-12 Surface Water - Runoff 2616

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6245 0.0 0.0 0.0
2019 8305 0.0 0.0 0.0
2020 2091 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-23 No Incident Encountered 0.00 0.00
2018-03-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References