X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485040105000

Well Details

Well ID: 0485040105000
Loading map...
Location: 00/05-01-048-04W5/0
Location Alias: 00/05-01-48-04 W5M
Location Alias 2: 00/05-01-048-04 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 04
Section: 01
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 5-1-48-4
Operator Name: Ridgeback Resources Inc.
License Number: 0422654
License Date: 2010-08-13
License Status: Amended
Spud Date: 2010-10-13
Final Drill Date: 2010-10-20
Well Total Depth: 3001.00 m
Surface Hole Latitude: 53.111280
Surface Hole Longitude: -114.437349

For data sources see[1][2]

Well History

Date Event
2010-08-13 Obtained License
2010-10-14 Surface Casing Operation Performed
2010-10-15 Direction Drilling Operation Performed - Horizontal
2010-10-17 Intermediate Casing Operation Performed
2010-10-20 Finished Drilling
2010-10-20 Perforation Treatment Performed - Open-Hole Completion
2010-10-20 Well Mode changed to Drilled and Cased
2010-10-21 Liner Casing Operation Performed
2010-10-21 Rig Released
2010-10-26 Well Log Performed
2010-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-07 Well Began Production
2010-11-07 Well Fluid changed to Crude Oil
2010-11-07 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-15 1042.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-20 Open Hole/Barefoot Completion 2818.30 3001.00 0
2010-11-02 Multi-Stage Fracture 2170.20 2170.30 0
2010-11-02 Multi-Stage Fracture 2100.60 2100.70 0
2010-11-02 Multi-Stage Fracture 2031.00 2031.10 0
2010-11-02 Multi-Stage Fracture 1950.10 1950.20 0
2010-11-02 Multi-Stage Fracture 1880.80 1880.90 0
2010-11-02 Multi-Stage Fracture 1800.90 1801.00 0
2010-11-02 Multi-Stage Fracture 1730.80 1730.90 0
2010-11-02 Multi-Stage Fracture 1659.50 1659.60 0
2010-11-02 Multi-Stage Fracture 1577.70 1577.80 0
2010-11-02 Multi-Stage Fracture 1508.10 1508.20 0
2010-11-02 Multi-Stage Fracture 2762.10 2762.20 0
2010-11-02 Multi-Stage Fracture 2690.60 2690.70 0
2010-11-02 Multi-Stage Fracture 2621.20 2621.30 0
2010-11-02 Multi-Stage Fracture 2541.40 2541.50 0
2010-11-02 Multi-Stage Fracture 2472.40 2472.50 0
2010-11-02 Multi-Stage Fracture 2391.70 2391.80 0
2010-11-02 Multi-Stage Fracture 2321.40 2321.50 0
2010-11-02 Multi-Stage Fracture 2251.10 2251.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 582 0.0 0.0 0.0
2011 8163 0.0 0.0 0.0
2012 8704 0.0 0.0 0.0
2013 7977 0.0 0.0 0.0
2014 8494 0.0 0.0 0.0
2015 8710 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 8570 0.0 0.0 0.0
2018 7932 0.0 0.0 0.0
2019 8493 0.0 0.0 0.0
2020 1957 0.0 0.0 0.0

For data sources see[6]

References