X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485032016000

Well Details

Well ID: 0485032016000
Loading map...
Location: 00/16-20-048-03W5/0
Location Alias: 00/16-20-48-03 W5M
Location Alias 2: 00/16-20-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 20
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 16-20-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0029129
License Date: 1965-10-08
License Status: Suspension
Spud Date: 1965-11-08
Final Drill Date: 1965-11-12
Well Total Depth: 1254.90 m
Surface Hole Latitude: 53.161394
Surface Hole Longitude: -114.395481

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-08 Obtained License
1965-11-12 Finished Drilling
1965-11-12 Well Mode changed to Drilled and Cased
1965-11-13 Drill Stem Test Performed
1965-11-14 Production Casing Operation Performed
1965-11-18 Perforation Treatment Performed - Acid Wash - No Pressure
1965-11-18 Perforation Treatment Performed - Fractured
1965-11-18 Perforation Treatment Performed - Selective Bullet Perforations
1965-12-15 Well Began Production
1965-12-15 Well Fluid changed to Crude Oil
1965-12-15 Well Mode changed to Pumping
1966-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-21 Perforation Treatment Performed - Selective Jet Perforations
1966-03-26 Well Fluid changed to Crude Oil
1966-03-26 Well Mode changed to Pumping
1966-04-19 Perforation Treatment Performed - Fractured
1977-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-20 Well Fluid changed to Crude Oil
1977-11-20 Well Mode changed to Abandoned Zone
1989-02-17 Perforation Treatment Performed - Jet Perforation
1989-02-17 Well Log Performed
1989-02-21 Perforation Treatment Performed - Fractured
1989-03-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-11-18 Selective Bullet Perforations 1241.80 1242.10 0
1966-03-21 Acid Treatment 933.60 935.70 0
1966-04-19 Fracture 933.60 935.70 0
1977-11-20 Packing Device Capped w/Cement 1231.10 1231.10 0
1989-02-17 Perforation 931.50 936.30 13
1989-02-17 Perforation 938.50 941.50 13
1989-02-21 Fracture 931.50 941.50 0
1965-11-18 Selective Bullet Perforations 1242.40 1242.70 0
1965-11-18 Selective Bullet Perforations 1243.90 1244.20 0
1965-11-18 Selective Bullet Perforations 1244.50 1244.50 0
1965-11-18 Acid Wash 1241.80 1244.50 0
1965-11-18 Fracture 1241.80 1244.50 0
1966-03-21 Selective Jet Perforations 935.40 935.70 0
1966-03-21 Selective Jet Perforations 933.60 933.90 0
1966-03-21 Selective Jet Perforations 934.20 935.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7920 0.0 0.0 0.0
1968 7760 0.0 0.0 0.0
1969 8479 0.0 0.0 0.0
1970 8471 0.0 0.0 0.0
1971 7540 0.0 0.0 0.0

For data sources see[5]

References