X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485032006000

Well Details

Well ID: 0485032006000
Loading map...
Location: 00/06-20-048-03W5/0
Location Alias: 00/06-20-48-03 W5M
Location Alias 2: 00/06-20-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 20
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 6-20-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0018778
License Date: 1960-02-26
License Status: RecCertified
Spud Date: 1960-04-17
Final Drill Date: 1960-04-23
Well Total Depth: 1257.30 m
Surface Hole Latitude: 53.154123
Surface Hole Longitude: -114.406297

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-02-26 Obtained License
1960-04-23 Finished Drilling
1960-04-23 Well Mode changed to Drilled and Cased
1960-04-24 Production Casing Operation Performed
1960-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-04-26 Perforation Treatment Performed - Fractured
1960-04-26 Perforation Treatment Performed - Jet Perforation
1960-05-26 Well Began Production
1960-05-26 Well Fluid changed to Crude Oil
1960-05-26 Well Mode changed to Pumping
1982-11-23 Well Fluid changed to Crude Oil
1982-11-23 Well Mode changed to Suspended
2005-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-16 Perforation Treatment Performed - Cement Plug
2005-07-16 Perforation Treatment Performed - Cement Squeeze
2005-07-16 Perforation Treatment Performed - Jet Perforation
2005-07-16 Plug Back Performed
2005-07-16 Well Fluid changed to Crude Oil
2005-07-16 Well Mode changed to Abandoned Zone
2006-10-12 Well Abandoned
2006-10-12 Well Fluid changed to Crude Oil
2006-10-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-04-26 Perforation 1239.00 1248.20 13
2005-07-16 Cement Plug 201.00 224.00 0
1960-04-26 Acid Treatment 1239.00 1248.20 0
1960-04-26 Fracture 1239.00 1248.20 0
2005-07-16 Packing Device Capped w/Cement 1220.00 1228.00 0
2005-07-16 Perforation 440.00 441.00 14
2005-07-16 Cement Squeeze 440.00 441.00 0
2005-07-16 Cement Plug 411.00 434.00 0
2005-07-16 Perforation 228.00 229.00 14
2005-07-16 Cement Squeeze 228.00 229.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8471 0.0 0.0 0.0
1968 8399 0.0 0.0 0.0
1969 8631 0.0 0.0 0.0
1970 8559 0.0 0.0 0.0
1971 8677 0.0 0.0 0.0
1972 8712 0.0 0.0 0.0
1973 8723 0.0 0.0 0.0
1974 8678 0.0 0.0 0.0
1975 8630 0.0 0.0 0.0
1976 8703 0.0 0.0 0.0
1977 1800 0.0 0.0 0.0
1978 5253 0.0 0.0 0.0
1979 7540 0.0 0.0 0.0
1980 7632 0.0 0.0 0.0
1981 8573 0.0 0.0 0.0
1982 7555 0.0 0.0 0.0

For data sources see[5]

References