X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031614000

Well Details

Well ID: 0485031614000
Loading map...
Location: 00/14-16-048-03W5/0
Location Alias: 00/14-16-48-03 W5M
Location Alias 2: 00/14-16-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 16
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 14-16-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0019776
License Date: 1960-09-28
License Status: RecCertified
Spud Date: 1960-10-07
Final Drill Date: 1960-10-15
Well Total Depth: 1280.20 m
Surface Hole Latitude: 53.146898
Surface Hole Longitude: -114.382327

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-09-28 Obtained License
1960-10-11 Drill Stem Test Performed
1960-10-15 Finished Drilling
1960-10-15 Well Mode changed to Drilled and Cased
1960-10-18 Production Casing Operation Performed
1960-11-11 Perforation Treatment Performed - Bullet Perforation
1960-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-22 Perforation Treatment Performed - Fractured
1960-12-06 Well Began Production
1960-12-06 Well Fluid changed to Crude Oil
1960-12-06 Well Mode changed to Flowing
1960-12-30 Perforation Treatment Performed - Jet Perforation
1961-01-02 Well Fluid changed to Crude Oil
1961-01-02 Well Mode changed to Pumping
1970-03-07 Perforation Treatment Performed - Cement Plug
1970-03-07 Well Fluid changed to Crude Oil
1970-03-07 Well Mode changed to Abandoned Zone
1973-02-08 Perforation Treatment Performed - Fractured
1996-10-27 Well Log Performed
1996-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-28 Perforation Treatment Performed - Jet Perforation
1996-10-28 Plug Back Performed
1996-10-29 Perforation Treatment Performed - Remedial Casing
1996-10-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-11-11 Bullet Perforation 1246.00 1247.90 13
1960-11-22 Acid Treatment 1246.00 1247.90 0
1960-11-22 Fracture 1246.00 1247.90 0
1960-12-30 Perforation 946.40 947.90 13
1970-03-07 Cement Plug 1220.40 1232.00 0
1973-02-08 Fracture 946.40 947.90 0
1996-10-28 Packing Device Capped w/Cement 922.00 930.00 0
1996-10-28 Perforation 245.00 245.50 13
1996-10-29 Remedial Casing Cementing 245.00 245.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 496 0.0 0.0 0.0
1968 3357 0.0 0.0 0.0
1969 7064 0.0 0.0 0.0
1970 672 0.0 0.0 0.0

For data sources see[5]

References