X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031604000

Well Details

Well ID: 0485031604000
Loading map...
Location: 00/04-16-048-03W5/0
Location Alias: 00/04-16-48-03 W5M
Location Alias 2: 00/04-16-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 16
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 4-16-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0044113
License Date: 1972-11-09
License Status: Abandoned
Spud Date: 1972-11-26
Final Drill Date: 1972-11-30
Well Total Depth: 958.60 m
Surface Hole Latitude: 53.135800
Surface Hole Longitude: -114.389569

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-11-09 Obtained License
1972-11-30 Finished Drilling
1972-11-30 Well Mode changed to Drilled and Cased
1972-12-01 Liner Casing Operation Performed
1972-12-08 Perforation Treatment Performed - Open-Hole Completion
1972-12-10 Well Began Production
1972-12-10 Well Fluid changed to Crude Oil
1972-12-10 Well Mode changed to Pumping
1974-05-28 Perforation Treatment Performed - Selective Jet Perforations
1974-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-05-29 Perforation Treatment Performed - Fractured
1980-02-10 Well Fluid changed to Crude Oil
1980-02-10 Well Mode changed to Suspended
1995-05-25 Well Log Performed
1995-05-27 Well Log Performed
1995-06-19 Well Began Injection
1995-06-19 Well Fluid changed to Water
1995-06-19 Well Type changed to Injection
1999-08-26 Well Fluid changed to Water
1999-08-26 Well Mode changed to Suspended
1999-08-26 Well Type changed to Injection
1999-12-01 Well Fluid changed to Water
1999-12-01 Well Type changed to Injection
1999-12-31 Well Fluid changed to Water
1999-12-31 Well Mode changed to Suspended
1999-12-31 Well Type changed to Injection
2000-09-12 Well Fluid changed to Water
2000-09-12 Well Type changed to Injection
2000-09-14 Well Fluid changed to Water
2000-09-14 Well Mode changed to Suspended
2000-09-14 Well Type changed to Injection
2000-10-06 Well Fluid changed to Water
2000-10-06 Well Type changed to Injection
2000-10-24 Well Fluid changed to Water
2000-10-24 Well Mode changed to Suspended
2000-10-24 Well Type changed to Injection
2001-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-13 Plug Back Performed
2001-09-13 Well Fluid changed to Water
2001-09-13 Well Mode changed to Abandoned Zone
2001-09-13 Well Type changed to Injection
2001-10-30 Well Abandoned
2001-10-30 Well Fluid changed to Water
2001-10-30 Well Mode changed to Abandoned
2001-10-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-12-08 Open Hole/Barefoot Completion 933.90 947.90 0
2001-09-13 Packing Device Capped w/Cement 917.00 925.00 0
2001-09-13 Packing Device Capped w/Cement 897.00 905.00 0
1974-05-28 Selective Jet Perforations 936.30 937.00 0
1974-05-28 Selective Jet Perforations 937.60 938.20 0
1974-05-28 Selective Jet Perforations 938.80 939.40 0
1974-05-28 Selective Jet Perforations 940.00 940.60 0
1974-05-28 Selective Jet Perforations 941.20 941.80 0
1974-05-28 Selective Jet Perforations 942.40 942.40 0
1974-05-29 Acid Treatment 936.30 942.40 0
1974-05-29 Fracture 936.30 942.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 516 0.0 0.0 0.0
1973 8421 0.0 0.0 0.0
1974 7941 0.0 0.0 0.0
1975 2452 0.0 0.0 0.0
1976 576 0.0 0.0 0.0
1977 766 0.0 0.0 0.0
1978 1368 0.0 0.0 0.0
1979 6438 0.0 0.0 0.0
1980 912 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References