X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031202000

Well Details

Well ID: 0485031202000
Loading map...
Location: 00/02-12-048-03W5/0
Location Alias: 00/02-12-48-03 W5M
Location Alias 2: 00/02-12-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 12
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 2-12-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0052471
License Date: 1975-01-13
License Status: RecCertified
Spud Date: 1975-01-30
Final Drill Date: 1975-02-02
Well Total Depth: 978.40 m
Surface Hole Latitude: 53.122115
Surface Hole Longitude: -114.302870

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-01-13 Obtained License
1975-02-02 Finished Drilling
1975-02-02 Well Mode changed to Drilled and Cased
1975-02-03 Production Casing Operation Performed
1975-03-02 Perforation Treatment Performed - Jet Perforation
1975-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-03 Perforation Treatment Performed - Fractured
1975-03-13 Well Began Production
1975-03-13 Well Fluid changed to Crude Oil
1975-03-13 Well Mode changed to Pumping
1994-09-01 Well Fluid changed to Crude Oil
1994-09-01 Well Mode changed to Suspended
2001-11-16 Well Fluid changed to Crude Oil
2001-11-16 Well Mode changed to Pumping
2001-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-17 Plug Back Performed
2001-11-17 Well Fluid changed to Crude Oil
2001-11-17 Well Mode changed to Abandoned Zone
2001-12-30 Well Abandoned
2001-12-30 Well Fluid changed to Crude Oil
2001-12-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-02 Perforation 951.90 952.80 3
1975-03-02 Perforation 954.60 955.20 3
1975-03-03 Acid Treatment 951.90 955.20 0
1975-03-03 Fracture 951.90 955.20 0
2001-11-17 Packing Device Capped w/Cement 934.00 942.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 5838 0.0 0.0 0.0
1976 4482 0.0 0.0 0.0
1977 3656 0.0 0.0 0.0
1978 4604 0.0 0.0 0.0
1979 8298 0.0 0.0 0.0
1980 7769 0.0 0.0 0.0
1981 7447 0.0 0.0 0.0
1982 6872 0.0 0.0 0.0
1983 7962 0.0 0.0 0.0
1984 8531 0.0 0.0 0.0
1985 8507 0.0 0.0 0.0
1986 8591 0.0 0.0 0.0
1987 8645 0.0 0.0 0.0
1988 8492 0.0 0.0 0.0
1989 8303 0.0 0.0 0.0
1990 8652 0.0 0.0 0.0
1991 8071 0.0 0.0 0.0
1992 8121 0.0 0.0 0.0
1993 6212 0.0 0.0 0.0
1994 5486 0.0 0.0 0.0
2001 48 0.0 0.0 0.0

For data sources see[5]

References