X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030801000

Well Details

Well ID: 0485030801000
Loading map...
Location: 00/01-08-048-03W5/0
Location Alias: 00/01-08-48-03 W5M
Location Alias 2: 00/01-08-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 08
County/Municipality: Brazeau County
Well Name: SDEL HZ PEMBINA 1-8-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0443960
License Date: 2012-02-09
License Status: Amended
Spud Date: 2012-02-19
Final Drill Date: 2012-02-27
Well Total Depth: 3150.00 m
Surface Hole Latitude: 53.125613
Surface Hole Longitude: -114.417835

For data sources see[1][2]

Well History

Date Event
2012-02-09 Obtained License
2012-02-19 Well Log Performed
2012-02-20 Surface Casing Operation Performed
2012-02-21 Direction Drilling Operation Performed - Horizontal
2012-02-23 Well Log Performed
2012-02-27 Finished Drilling
2012-02-27 Well Log Performed
2012-02-27 Well Mode changed to Drilled and Cased
2012-02-29 Production Casing Operation Performed
2012-02-29 Rig Released
2012-03-16 Well Log Performed
2012-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-24 Perforation Treatment Performed - Open-Hole Completion
2012-03-27 Well Began Production
2012-03-27 Well Fluid changed to Crude Oil
2012-03-27 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-19 Nabors Drilling Limited 3 N/A Drill To LD
2012-02-19 Nabors Drilling Limited 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-21 705.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-24 Open Hole/Barefoot Completion 3145.00 3150.00 0
2012-03-24 Multi-Stage Fracture 2502.40 2502.50 0
2012-03-24 Multi-Stage Fracture 2428.30 2428.40 0
2012-03-24 Multi-Stage Fracture 2354.50 2354.60 0
2012-03-24 Multi-Stage Fracture 2280.80 2280.90 0
2012-03-24 Multi-Stage Fracture 2195.90 2196.00 0
2012-03-24 Multi-Stage Fracture 2122.00 2122.10 0
2012-03-24 Multi-Stage Fracture 2047.90 2048.00 0
2012-03-24 Multi-Stage Fracture 1973.90 1974.00 0
2012-03-24 Multi-Stage Fracture 1899.80 1899.90 0
2012-03-24 Multi-Stage Fracture 1825.50 1825.60 0
2012-03-24 Multi-Stage Fracture 3122.00 3122.10 0
2012-03-24 Multi-Stage Fracture 3018.20 3018.30 0
2012-03-24 Multi-Stage Fracture 2956.20 2956.30 0
2012-03-24 Multi-Stage Fracture 2883.00 2883.10 0
2012-03-24 Multi-Stage Fracture 2809.70 2809.80 0
2012-03-24 Multi-Stage Fracture 2736.10 2736.20 0
2012-03-24 Multi-Stage Fracture 2650.90 2651.00 0
2012-03-24 Multi-Stage Fracture 2576.80 2576.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6460 0.0 0.0 0.0
2013 8295 0.0 0.0 0.0
2014 8451 0.0 0.0 0.0
2015 8729 0.0 0.0 0.0
2016 8587 0.0 0.0 0.0
2017 8507 0.0 0.0 0.0
2018 8119 0.0 0.0 0.0
2019 8638 0.0 0.0 0.0
2020 1080 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References