X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030708000

Well Details

Well ID: 0485030708000
Loading map...
Location: 00/08-07-048-03W5/0
Location Alias: 00/08-07-48-03 W5M
Location Alias 2: 00/08-07-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 07
County/Municipality: Brazeau County
Well Name: TALISMAN PEM 8-7-48-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0018829
License Date: 1960-03-08
License Status: RecCertified
Spud Date: 1960-03-14
Final Drill Date: 1960-03-19
Well Total Depth: 987.60 m
Surface Hole Latitude: 53.125017
Surface Hole Longitude: -114.419216

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-03-08 Obtained License
1960-03-19 Finished Drilling
1960-03-19 Production Casing Operation Performed
1960-03-19 Well Mode changed to Drilled and Cased
1960-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-21 Perforation Treatment Performed - Fractured
1960-03-21 Perforation Treatment Performed - Jet Perforation
1960-05-09 Well Began Production
1960-05-09 Well Fluid changed to Crude Oil
1960-05-09 Well Mode changed to Pumping
1980-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-16 Perforation Treatment Performed - Jet Perforation
1987-06-10 Perforation Treatment Performed - Fractured
1988-10-05 Perforation Treatment Performed - Fractured
1995-05-01 Well Fluid changed to Crude Oil
1995-05-01 Well Mode changed to Suspended
1996-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-22 Perforation Treatment Performed - Jet Perforation
1996-10-22 Perforation Treatment Performed - Remedial Casing
1996-10-22 Plug Back Performed
1996-10-22 Well Log Performed
1996-10-31 Well Abandoned
1996-10-31 Well Fluid changed to Crude Oil
1996-10-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-03-21 Perforation 970.80 972.30 13
1996-10-22 Perforation 250.00 250.50 13
1996-10-22 Remedial Casing Cementing 250.00 250.50 0
1960-03-21 Acid Treatment 970.80 972.30 0
1960-03-21 Fracture 970.80 972.30 0
1980-09-16 Perforation 965.80 968.00 13
1980-09-16 Perforation 968.60 969.90 13
1980-09-16 Acid Treatment 965.80 972.30 0
1987-06-10 Fracture 965.80 972.30 0
1988-10-05 Fracture 965.80 972.30 0
1996-10-22 Packing Device Capped w/Cement 951.00 959.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6300 0.0 0.0 0.0
1968 5438 0.0 0.0 0.0
1969 5184 0.0 0.0 0.0
1970 5588 0.0 0.0 0.0
1971 7985 0.0 0.0 0.0
1972 8588 0.0 0.0 0.0
1973 8436 0.0 0.0 0.0
1974 8319 0.0 0.0 0.0
1975 6327 0.0 0.0 0.0
1976 5560 0.0 0.0 0.0
1977 4188 0.0 0.0 0.0
1978 3045 0.0 0.0 0.0
1979 8166 0.0 0.0 0.0
1980 8150 0.0 0.0 0.0
1981 8226 0.0 0.0 0.0
1982 8136 0.0 0.0 0.0
1983 8489 0.0 0.0 0.0
1984 8532 0.0 0.0 0.0
1985 8373 0.0 0.0 0.0
1986 8548 0.0 0.0 0.0
1987 8069 0.0 0.0 0.0
1988 7573 0.0 0.0 0.0
1989 8553 0.0 0.0 0.0
1990 7668 0.0 0.0 0.0
1991 8541 0.0 0.0 0.0
1992 8412 0.0 0.0 0.0
1993 8559 0.0 0.0 0.0
1994 7775 0.0 0.0 0.0
1995 2879 0.0 0.0 0.0

For data sources see[5]

References