X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030516020

Well Details

Well ID: 0485030516020
Loading map...
Location: 02/16-05-048-03W5/0
Location Alias: 02/16-05-48-03 W5M
Location Alias 2: 02/16-05-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 05
County/Municipality: Brazeau County
Well Name: CPOG KEY PEM 16-5-48-3
Operator Name: Ovintiv Canada ULC
License Number: 0028002
License Date: 1965-03-18
License Status: RecCertified
Spud Date: 1965-03-23
Final Drill Date: 1965-03-31
Well Total Depth: 972.30 m
Surface Hole Latitude: 53.118445
Surface Hole Longitude: -114.395890

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-03-18 Obtained License
1965-03-31 Finished Drilling
1965-03-31 Well Mode changed to Drilled and Cased
1965-04-01 Production Casing Operation Performed
1965-04-04 Perforation Treatment Performed - Acid Wash - No Pressure
1965-04-04 Perforation Treatment Performed - Fractured
1965-04-04 Perforation Treatment Performed - Jet Perforation
1965-06-26 Well Began Production
1965-06-26 Well Fluid changed to Crude Oil
1965-06-26 Well Mode changed to Pumping
1973-07-13 Perforation Treatment Performed - Chemical Squeeze
1973-08-17 Well Began Injection
1973-08-17 Well Fluid changed to Water
1973-08-17 Well Type changed to Injection
1980-03-28 Perforation Treatment Performed - Jet Perforation
1980-03-29 Perforation Treatment Performed - Fractured
1982-11-23 Well Fluid changed to Water
1982-11-23 Well Mode changed to Suspended
1982-11-23 Well Type changed to Injection
1996-03-21 Well Fluid changed to Water
1996-03-21 Well Mode changed to Closed
1996-03-21 Well Type changed to Injection
1996-07-19 Well Fluid changed to Water
1996-07-19 Well Mode changed to Suspended
1996-07-19 Well Type changed to Injection
1996-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-24 Perforation Treatment Performed - Jet Perforation
1996-10-24 Perforation Treatment Performed - Remedial Casing
1996-10-24 Plug Back Performed
1996-10-24 Well Log Performed
1996-10-31 Well Abandoned
1996-10-31 Well Fluid changed to Water
1996-10-31 Well Mode changed to Abandoned
1996-10-31 Well Type changed to Injection
2003-08-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-04-04 Perforation 941.80 942.40 7
1996-10-24 Packing Device Capped w/Cement 926.00 934.00 0
1996-10-24 Perforation 235.00 235.50 13
1996-10-24 Remedial Casing Cementing 235.00 235.50 0
1965-04-04 Perforation 943.10 943.40 7
1965-04-04 Perforation 944.30 944.60 7
1965-04-04 Acid Wash 941.80 944.60 0
1965-04-04 Fracture 941.80 944.60 0
1973-07-13 Chemical Squeeze 941.80 944.60 0
1980-03-28 Perforation 945.70 946.20 7
1980-03-28 Perforation 946.70 947.90 7
1980-03-29 Fracture 941.80 947.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8759 0.0 0.0 0.0
1968 8783 0.0 0.0 0.0
1969 8269 0.0 0.0 0.0
1970 8627 0.0 0.0 0.0
1971 8490 0.0 0.0 0.0
1972 8528 0.0 0.0 0.0
1973 3479 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0

For data sources see[5]

References