If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485030509000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.114209,"lon":-114.420246,"icon":""}]} |
Location: 00/09-05-048-03W5/0 | |
Location Alias: 00/09-05-48-03 W5M | |
Location Alias 2: 00/09-05-048-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 03 | |
Section: 05 | |
County/Municipality: Brazeau County | |
Well Name: WHITECAP PEMBINA 9-5-48-3 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0442722 | |
License Date: 2012-01-12 | |
License Status: Amended | |
Spud Date: 2012-03-11 | |
Final Drill Date: 2012-03-19 | |
Well Total Depth: 2866.80 m | |
Surface Hole Latitude: 53.114209 | |
Surface Hole Longitude: -114.420246 |
Date | Event |
---|---|
2012-01-12 | Obtained License |
2012-03-12 | Surface Casing Operation Performed |
2012-03-13 | Well Log Performed |
2012-03-14 | Direction Drilling Operation Performed - Deviate |
2012-03-15 | Direction Drilling Operation Performed - Horizontal |
2012-03-16 | Intermediate Casing Operation Performed |
2012-03-17 | Well Log Performed |
2012-03-19 | Finished Drilling |
2012-03-19 | Well Mode changed to Drilled and Cased |
2012-03-20 | Liner Casing Operation Performed |
2012-03-20 | Well Began Production |
2012-03-20 | Well Fluid changed to Crude Oil |
2012-03-20 | Well Mode changed to Pumping |
2012-03-21 | Rig Released |
2012-03-23 | Well Log Performed |
2012-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-26 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-11 | Trinidad Drilling Ltd. | 2 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-14 | 1035.00 | Deviate (5 - 79 degrees) |
2012-03-15 | 1493.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-26 | Open Hole/Barefoot Completion | 2864.00 | 2866.80 | 0 |
2012-03-26 | Multi-Stage Fracture | 2211.30 | 2211.40 | 0 |
2012-03-26 | Multi-Stage Fracture | 2137.00 | 2137.10 | 0 |
2012-03-26 | Multi-Stage Fracture | 2063.10 | 2063.20 | 0 |
2012-03-26 | Multi-Stage Fracture | 1988.00 | 1988.10 | 0 |
2012-03-26 | Multi-Stage Fracture | 1913.50 | 1913.60 | 0 |
2012-03-26 | Multi-Stage Fracture | 1839.70 | 1839.80 | 0 |
2012-03-26 | Multi-Stage Fracture | 1764.90 | 1765.00 | 0 |
2012-03-26 | Multi-Stage Fracture | 1690.80 | 1690.90 | 0 |
2012-03-26 | Multi-Stage Fracture | 1602.30 | 1602.40 | 0 |
2012-03-26 | Multi-Stage Fracture | 1527.80 | 1527.90 | 0 |
2012-03-26 | Multi-Stage Fracture | 2826.90 | 2827.00 | 0 |
2012-03-26 | Multi-Stage Fracture | 2747.80 | 2747.90 | 0 |
2012-03-26 | Multi-Stage Fracture | 2673.20 | 2673.30 | 0 |
2012-03-26 | Multi-Stage Fracture | 2598.70 | 2598.80 | 0 |
2012-03-26 | Multi-Stage Fracture | 2524.50 | 2524.60 | 0 |
2012-03-26 | Multi-Stage Fracture | 2449.20 | 2449.30 | 0 |
2012-03-26 | Multi-Stage Fracture | 2374.40 | 2374.50 | 0 |
2012-03-26 | Multi-Stage Fracture | 2299.50 | 2299.60 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6552 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8735 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8735 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-21 | No Incident Encountered | 0.00 | 0.00 |
2012-03-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]