X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030501000

Well Details

Well ID: 0485030501000
Loading map...
Location: 00/01-05-048-03W5/0
Location Alias: 00/01-05-48-03 W5M
Location Alias 2: 00/01-05-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 05
County/Municipality: Brazeau County
Well Name: SDEL HZ PEMBINA 1-5-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0447732
License Date: 2012-08-14
License Status: Issued
Spud Date: 2012-08-19
Final Drill Date: 2012-08-22
Well Total Depth: 2691.00 m
Surface Hole Latitude: 53.108160
Surface Hole Longitude: -114.417646

For data sources see[1][2]

Well History

Date Event
2012-08-14 Obtained License
2012-08-20 Direction Drilling Operation Performed - Deviate
2012-08-20 Surface Casing Operation Performed
2012-08-20 Well Log Performed
2012-08-21 Direction Drilling Operation Performed - Horizontal
2012-08-21 Well Log Performed
2012-08-22 Finished Drilling
2012-08-22 Well Log Performed
2012-08-22 Well Mode changed to Drilled and Cased
2012-08-24 Production Casing Operation Performed
2012-08-24 Rig Released
2012-08-31 Well Log Performed
2012-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-05 Perforation Treatment Performed - Open-Hole Completion
2012-09-10 Well Began Production
2012-09-10 Well Fluid changed to Crude Oil
2012-09-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-08-20 1036.30 Deviate (5 - 79 degrees)
2012-08-21 1416.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-05 Open Hole/Barefoot Completion 2686.00 2691.00 0
2012-09-05 Multi-Stage Fracture 2130.50 2130.60 0
2012-09-05 Multi-Stage Fracture 2056.80 2056.90 0
2012-09-05 Multi-Stage Fracture 1994.90 1995.00 0
2012-09-05 Multi-Stage Fracture 1932.40 1932.50 0
2012-09-05 Multi-Stage Fracture 1858.30 1858.40 0
2012-09-05 Multi-Stage Fracture 1795.50 1795.60 0
2012-09-05 Multi-Stage Fracture 1733.30 1733.40 0
2012-09-05 Multi-Stage Fracture 1670.70 1670.80 0
2012-09-05 Multi-Stage Fracture 1596.80 1596.90 0
2012-09-05 Multi-Stage Fracture 1534.20 1534.30 0
2012-09-05 Multi-Stage Fracture 2661.00 2661.10 0
2012-09-05 Multi-Stage Fracture 1448.60 1448.70 0
2012-09-05 Multi-Stage Fracture 2591.70 2591.80 0
2012-09-05 Multi-Stage Fracture 2528.90 2529.00 0
2012-09-05 Multi-Stage Fracture 2454.40 2454.50 0
2012-09-05 Multi-Stage Fracture 2391.60 2391.70 0
2012-09-05 Multi-Stage Fracture 2328.90 2329.00 0
2012-09-05 Multi-Stage Fracture 2254.90 2255.00 0
2012-09-05 Multi-Stage Fracture 2192.10 2192.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2588 0.0 0.0 0.0
2013 8717 0.0 0.0 0.0
2014 8733 0.0 0.0 0.0
2015 7562 0.0 0.0 0.0
2016 5255 0.0 0.0 0.0
2017 6111 0.0 0.0 0.0
2018 8119 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-24 No Incident Encountered 0.00 0.00
2012-09-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References