X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030405000

Well Details

Well ID: 0485030405000
Loading map...
Location: 00/05-04-048-03W5/0
Location Alias: 00/05-04-48-03 W5M
Location Alias 2: 00/05-04-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 04
County/Municipality: Leduc County
Well Name: WHITECAP PEMBINA 5-4-48-3
Operator Name: Whitecap Resources Inc.
License Number: 0447974
License Date: 2012-08-24
License Status: Issued
Spud Date: 2012-09-06
Final Drill Date: 2012-09-14
Well Total Depth: 2792.00 m
Surface Hole Latitude: 53.109305
Surface Hole Longitude: -114.363862

For data sources see[1][2]

Well History

Date Event
2012-08-24 Obtained License
2012-09-06 Well Log Performed
2012-09-07 Surface Casing Operation Performed
2012-09-08 Direction Drilling Operation Performed - Deviate
2012-09-11 Intermediate Casing Operation Performed
2012-09-12 Direction Drilling Operation Performed - Horizontal
2012-09-14 Finished Drilling
2012-09-14 Well Mode changed to Drilled and Cased
2012-09-15 Liner Casing Operation Performed
2012-09-15 Rig Released
2012-09-17 Well Log Performed
2012-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-21 Perforation Treatment Performed - Open-Hole Completion
2012-09-26 Well Began Production
2012-09-26 Well Fluid changed to Crude Oil
2012-09-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-06 Nabors Drilling Limited 12 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-08 315.00 Deviate (5 - 79 degrees)
2012-09-12 1507.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-21 Open Hole/Barefoot Completion 2790.00 2792.00 0
2012-09-21 Multi-Stage Fracture 2182.00 2182.10 0
2012-09-21 Multi-Stage Fracture 2110.20 2110.30 0
2012-09-21 Multi-Stage Fracture 2037.60 2037.70 0
2012-09-21 Multi-Stage Fracture 1965.00 1965.10 0
2012-09-21 Multi-Stage Fracture 1892.50 1892.60 0
2012-09-21 Multi-Stage Fracture 1833.60 1833.70 0
2012-09-21 Multi-Stage Fracture 1761.10 1761.20 0
2012-09-21 Multi-Stage Fracture 1689.70 1689.80 0
2012-09-21 Multi-Stage Fracture 1617.20 1617.30 0
2012-09-21 Multi-Stage Fracture 1545.30 1545.40 0
2012-09-21 Multi-Stage Fracture 2754.20 2754.30 0
2012-09-21 Multi-Stage Fracture 2681.80 2681.90 0
2012-09-21 Multi-Stage Fracture 2612.30 2612.40 0
2012-09-21 Multi-Stage Fracture 2541.60 2541.70 0
2012-09-21 Multi-Stage Fracture 2469.10 2469.20 0
2012-09-21 Multi-Stage Fracture 2396.60 2396.70 0
2012-09-21 Multi-Stage Fracture 2326.40 2326.50 0
2012-09-21 Multi-Stage Fracture 2254.50 2254.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2240 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8531 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8616 0.0 0.0 0.0
2017 8678 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8688 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-15 No Incident Encountered 0.00 0.00
2012-09-19 No Incident Encountered 0.00 0.00

For data sources see[8]

References