X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030101020

Well Details

Well ID: 0485030101020
Loading map...
Location: 02/01-01-048-03W5/0
Location Alias: 02/01-01-48-03 W5M
Location Alias 2: 02/01-01-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 01
County/Municipality: Leduc County
Well Name: DAYLIGHT 102 HZ PEMBINA 1-1-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0429719
License Date: 2011-01-10
License Status: Amended
Spud Date: 2011-02-12
Final Drill Date: 2011-02-25
Well Total Depth: 2837.00 m
Surface Hole Latitude: 53.108239
Surface Hole Longitude: -114.322069

For data sources see[1][2]

Well History

Date Event
2011-01-10 Obtained License
2011-02-13 Surface Casing Operation Performed
2011-02-13 Well Log Performed
2011-02-14 Direction Drilling Operation Performed - Horizontal
2011-02-17 Intermediate Casing Operation Performed
2011-02-25 Finished Drilling
2011-02-25 Well Mode changed to Drilled and Cased
2011-03-01 Liner Casing Operation Performed
2011-03-01 Well Began Production
2011-03-01 Well Fluid changed to Crude Oil
2011-03-01 Well Mode changed to Pumping
2011-03-02 Rig Released
2011-03-06 Well Log Performed
2011-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-10 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-14 323.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-10 Open Hole/Barefoot Completion 2832.00 2837.00 0
2011-03-10 Multi-Stage Fracture 2187.60 2187.70 0
2011-03-10 Multi-Stage Fracture 2113.00 2113.10 0
2011-03-10 Multi-Stage Fracture 2038.80 2038.90 0
2011-03-10 Multi-Stage Fracture 1964.70 1964.80 0
2011-03-10 Multi-Stage Fracture 1890.20 1890.30 0
2011-03-10 Multi-Stage Fracture 1804.60 1804.70 0
2011-03-10 Multi-Stage Fracture 1730.30 1730.40 0
2011-03-10 Multi-Stage Fracture 1656.20 1656.30 0
2011-03-10 Multi-Stage Fracture 1582.20 1582.40 0
2011-03-10 Multi-Stage Fracture 1508.80 1508.90 0
2011-03-10 Multi-Stage Fracture 2811.10 2811.20 0
2011-03-10 Multi-Stage Fracture 2719.10 2719.20 0
2011-03-10 Multi-Stage Fracture 2644.80 2644.90 0
2011-03-10 Multi-Stage Fracture 2570.70 2570.80 0
2011-03-10 Multi-Stage Fracture 2496.20 2496.30 0
2011-03-10 Multi-Stage Fracture 2421.60 2421.70 0
2011-03-10 Multi-Stage Fracture 2335.70 2335.80 0
2011-03-10 Multi-Stage Fracture 2261.90 2262.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6236 0.0 0.0 0.0
2012 8655 0.0 0.0 0.0
2013 8591 0.0 0.0 0.0
2014 8583 0.0 0.0 0.0
2015 8722 0.0 0.0 0.0
2016 8755 0.0 0.0 0.0
2017 8657 0.0 0.0 0.0
2018 7097 0.0 0.0 0.0
2019 3614 0.0 0.0 0.0
2020 2063 0.0 0.0 0.0

For data sources see[6]

References