X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485021902002

Well Details

Well ID: 0485021902002
Loading map...
Location: 00/02-19-048-02W5/2
Location Alias: 00/02-19-48-02 W5M
Location Alias 2: 00/02-19-048-02 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 02
Section: 19
County/Municipality: Leduc County
Well Name: JOURNEY PEMBINA 2-19-48-2
Operator Name: Journey Energy Inc.
License Number: 0311964
License Date: 2004-07-19
License Status: Abandoned
Spud Date: 2004-08-29
Final Drill Date: 2004-08-30
Well Total Depth: 995.00 m
Surface Hole Latitude: 53.150667
Surface Hole Longitude: -114.279342

For data sources see[1][2]

Well History

Date Event
2004-07-19 Obtained License
2004-08-30 Finished Drilling
2004-08-30 Perforation Treatment Performed - Jet Perforation
2004-08-30 Well Mode changed to Drilled and Cased
2004-09-01 Perforation Treatment Performed - Cement Squeeze
2004-09-01 Plug Back Performed
2004-09-03 Perforation Treatment Performed - Jet Perforation
2004-09-05 Rig Released
2004-09-16 Perforation Treatment Performed - Jet Perforation
2004-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-11 Perforation Treatment Performed - Jet Perforation
2004-12-11 Plug Back Performed
2004-12-11 Well Mode changed to Abandoned Zone
2004-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-16 Plug Back Performed
2004-12-17 Perforation Treatment Performed - Jet Perforation
2011-04-01 Perforation Treatment Performed - Cement Plug
2011-04-01 Perforation Treatment Performed - Remedial Casing
2011-04-01 Plug Back Performed
2019-11-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-08-30 Perforation 895.50 897.50 13
2011-04-01 Remedial Casing Cementing 225.00 232.00 0
2011-04-01 Cement Plug 149.00 232.00 0
2004-09-01 Cement Squeeze 895.50 897.50 0
2004-09-03 Perforation 932.00 938.00 14
2004-09-16 Perforation 913.40 919.40 20
2004-09-21 Acid Treatment 913.40 919.40 0
2004-12-11 Packing Device Capped w/Cement 869.00 877.00 0
2004-12-11 Perforation 746.00 752.00 14
2004-12-16 Packing Device Capped w/Cement 725.00 733.00 0
2004-12-17 Perforation 225.00 232.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-19 No Incident Encountered 0.00 0.00
2011-04-02 No Incident Encountered 0.00 0.00

For data sources see[5]

References