If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485020914020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.133528,"lon":-114.234174,"icon":""}]} |
Location: 02/14-09-048-02W5/0 | |
Location Alias: 02/14-09-48-02 W5M | |
Location Alias 2: 02/14-09-048-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 02 | |
Section: 09 | |
County/Municipality: Leduc County | |
Well Name: DAYLIGHT PEMBINA 14-9-48-2 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0100988 | |
License Date: 1983-03-14 | |
License Status: RecCertified | |
Spud Date: 1983-07-15 | |
Final Drill Date: 1983-07-20 | |
Well Total Depth: 930.00 m | |
Surface Hole Latitude: 53.133528 | |
Surface Hole Longitude: -114.234174 |
Date | Event |
---|---|
1983-03-14 | Obtained License |
1983-07-20 | Finished Drilling |
1983-07-20 | Well Log Performed |
1983-07-20 | Well Mode changed to Drilled and Cased |
1983-07-21 | Drill Stem Test Performed |
1983-07-22 | Drill Stem Test Performed |
1983-07-23 | Drill Stem Test Performed |
1983-07-23 | Production Casing Operation Performed |
1983-09-09 | Perforation Treatment Performed - Jet Perforation |
1983-09-13 | Perforation Treatment Performed - Jet Perforation |
1983-09-16 | Perforation Treatment Performed - Fractured |
1983-09-24 | Well Began Production |
1983-09-24 | Well Fluid changed to Crude Oil |
1983-09-24 | Well Mode changed to Pumping |
1986-04-01 | Well Fluid changed to Crude Oil |
1986-04-01 | Well Mode changed to Suspended |
1989-09-13 | Well Fluid changed to Crude Oil |
1989-09-13 | Well Mode changed to Pumping |
1991-10-22 | Well Log Performed |
1991-10-23 | Perforation Treatment Performed - Jet Perforation |
1991-10-25 | Perforation Treatment Performed - Chemical Squeeze |
1992-02-01 | Well Began Injection |
1992-02-01 | Well Fluid changed to Water |
1992-02-01 | Well Type changed to Injection |
2003-07-21 | Well Fluid changed to Water |
2003-07-21 | Well Mode changed to Suspended |
2003-07-21 | Well Type changed to Injection |
2005-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-06 | Plug Back Performed |
2005-09-06 | Well Fluid changed to Water |
2005-09-06 | Well Mode changed to Abandoned Zone |
2005-09-06 | Well Type changed to Injection |
2005-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-07 | Perforation Treatment Performed - Cement Squeeze |
2005-09-07 | Perforation Treatment Performed - Jet Perforation |
2005-09-07 | Perforation Treatment Performed - Remedial Casing |
2005-09-07 | Plug Back Performed |
2007-10-18 | Well Abandoned |
2007-10-18 | Well Fluid changed to Water |
2007-10-18 | Well Mode changed to Abandoned |
2007-10-18 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-09-09 | Perforation | 905.00 | 906.00 | 13 |
2005-09-07 | Packing Device Capped w/Cement | 335.00 | 357.50 | 0 |
2005-09-07 | Perforation | 196.00 | 197.00 | 14 |
2005-09-07 | Remedial Casing Cementing | 196.00 | 197.00 | 0 |
2005-09-07 | Packing Device Capped w/Cement | 176.00 | 188.00 | 0 |
1983-09-13 | Perforation | 902.50 | 905.00 | 13 |
1983-09-16 | Fracture | 902.50 | 905.00 | 0 |
1991-10-23 | Perforation | 894.50 | 897.00 | 13 |
1991-10-23 | Perforation | 907.00 | 911.00 | 13 |
1991-10-25 | Chemical Squeeze | 894.50 | 911.00 | 0 |
2005-09-06 | Packing Device Capped w/Cement | 879.00 | 887.00 | 0 |
2005-09-07 | Perforation | 365.00 | 366.00 | 14 |
2005-09-07 | Cement Squeeze | 365.00 | 366.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 1865 | 0.0 | 0.0 | 0.0 |
1984 | 8311 | 0.0 | 0.0 | 0.0 |
1985 | 8155 | 0.0 | 0.0 | 0.0 |
1986 | 2184 | 0.0 | 0.0 | 0.0 |
1989 | 1488 | 0.0 | 0.0 | 0.0 |
1990 | 4789 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]