X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485020506002

Well Details

Well ID: 0485020506002
Loading map...
Location: 00/06-05-048-02W5/2
Location Alias: 00/06-05-48-02 W5M
Location Alias 2: 00/06-05-048-02 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 02
Section: 05
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 6-5-48-2
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0021029
License Date: 1961-07-04
License Status: Issued
Spud Date: 1961-08-06
Final Drill Date: 1961-08-12
Well Total Depth: 1282.60 m
Surface Hole Latitude: 53.110542
Surface Hole Longitude: -114.260677

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-07-04 Obtained License
1961-08-11 Production Casing Operation Performed
1961-08-12 Finished Drilling
1961-08-12 Perforation Treatment Performed - Open-Hole Completion
1961-08-12 Well Mode changed to Drilled and Cased
1961-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-20 Perforation Treatment Performed - Fractured
1968-11-25 Perforation Treatment Performed - Fractured
1993-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-10 Plug Back Performed
1993-11-10 Well Log Performed
1993-11-11 Perforation Treatment Performed - Jet Perforation
1993-11-11 Well Log Performed
1993-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-14 Perforation Treatment Performed - Fractured
1993-12-10 Well Began Injection
1993-12-10 Well Fluid changed to Water
1993-12-10 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-12 Open Hole/Barefoot Completion 1281.10 1282.60 0
1961-08-19 Acid Treatment 1281.10 1282.60 0
1961-08-20 Fracture 1281.10 1282.60 0
1968-11-25 Fracture 1281.10 1282.60 0
1993-11-10 Packing Device Capped w/Cement 1255.00 1263.00 0
1993-11-11 Perforation 957.70 962.60 13
1993-11-11 Perforation 965.60 971.00 13
1993-11-12 Acid Treatment 957.70 971.00 0
1993-11-14 Fracture 957.70 971.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References