X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485020316020

Well Details

Well ID: 0485020316020
Loading map...
Location: 02/16-03-048-02W5/0
Location Alias: 02/16-03-48-02 W5M
Location Alias 2: 02/16-03-048-02 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 02
Section: 03
County/Municipality: Leduc County
Well Name: NUVISTA 102 HZ PEMBINA 16-3-48-2
Operator Name: NuVista Energy Ltd.
License Number: 0421262
License Date: 2010-06-18
License Status: Suspension
Spud Date: 2010-07-29
Final Drill Date: 2010-08-09
Well Total Depth: 2583.00 m
Surface Hole Latitude: 53.119029
Surface Hole Longitude: -114.222237

For data sources see[1][2]

Well History

Date Event
2010-06-18 Obtained License
2010-07-30 Surface Casing Operation Performed
2010-07-30 Well Log Performed
2010-07-31 Well Log Performed
2010-08-01 Direction Drilling Operation Performed - Horizontal
2010-08-09 Finished Drilling
2010-08-09 Well Mode changed to Drilled and Cased
2010-08-14 Perforation Treatment Performed - Open-Hole Completion
2010-08-14 Production Casing Operation Performed
2010-08-14 Rig Released
2010-10-05 Well Log Performed
2010-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-24 Well Began Production
2010-10-24 Well Fluid changed to Crude Oil
2010-10-24 Well Mode changed to Pumping
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-01 978.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-14 Open Hole/Barefoot Completion 1262.00 2583.00 0
2010-10-09 Multi-Stage Fracture 1906.60 1906.70 0
2010-10-09 Multi-Stage Fracture 1981.30 1981.40 0
2010-10-09 Multi-Stage Fracture 2056.00 2056.10 0
2010-10-09 Multi-Stage Fracture 2119.30 2119.40 0
2010-10-09 Multi-Stage Fracture 2194.60 2194.70 0
2010-10-09 Multi-Stage Fracture 2269.50 2269.60 0
2010-10-09 Multi-Stage Fracture 2332.90 2333.00 0
2010-10-09 Multi-Stage Fracture 2407.80 2407.90 0
2010-10-09 Multi-Stage Fracture 2477.60 2477.70 0
2010-10-09 Multi-Stage Fracture 1353.50 1353.60 0
2010-10-09 Multi-Stage Fracture 1416.90 1417.00 0
2010-10-09 Multi-Stage Fracture 1491.00 1491.10 0
2010-10-09 Multi-Stage Fracture 1554.10 1554.20 0
2010-10-09 Multi-Stage Fracture 1629.40 1629.50 0
2010-10-09 Multi-Stage Fracture 1704.30 1704.40 0
2010-10-09 Multi-Stage Fracture 1767.50 1767.60 0
2010-10-09 Multi-Stage Fracture 1842.90 1843.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1653 0.0 0.0 0.0
2011 8729 0.0 0.0 0.0
2012 8449 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 4973 0.0 0.0 0.0

For data sources see[6]

References