X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272212022

Well Details

Well ID: 0484272212022
Loading map...
Location: 02/12-22-048-27W4/2
Location Alias: 02/12-22-48-27 W4M
Location Alias 2: 02/12-22-048-27 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 22
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE 12-22-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0123625
License Date: 1986-08-12
License Status: Abandoned
Spud Date: 1986-08-23
Final Drill Date: 1986-10-09
Well Total Depth: 2026.50 m
Surface Hole Latitude: 53.159085
Surface Hole Longitude: -113.874014

For data sources see[1][2]

Well History

Date Event
1986-08-12 Obtained License
1986-08-23 Surface Casing Operation Performed
1986-09-01 Production Casing Operation Performed
1986-09-01 Rig Released
1986-10-09 Finished Drilling
1986-10-09 Perforation Treatment Performed - Open-Hole Completion
1986-10-09 Well Log Performed
1986-10-09 Well Mode changed to Drilled and Cased
1986-10-24 Well Log Performed
1986-11-09 Liner Casing Operation Performed
1986-11-09 Perforation Treatment Performed - Cement Squeeze
1986-11-12 Well Log Performed
1986-11-20 Perforation Treatment Performed - Jet Perforation
1986-11-20 Well Log Performed
1986-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-19 Perforation Treatment Performed - Cement Squeeze
1988-02-21 Perforation Treatment Performed - Jet Perforation
1988-02-21 Well Log Performed
1988-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-31 Perforation Treatment Performed - Cement Squeeze
1990-11-07 Perforation Treatment Performed - Jet Perforation
1990-11-07 Well Log Performed
1990-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-09 Perforation Treatment Performed - Cement Squeeze
1990-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-12 Perforation Treatment Performed - Jet Perforation
1990-11-12 Well Log Performed
1990-11-13 Perforation Treatment Performed - Cement Squeeze
1990-11-15 Perforation Treatment Performed - Cement Squeeze
1990-11-17 Well Log Performed
1990-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-19 Well Log Performed
1993-09-28 Perforation Treatment Performed - Cement Squeeze
1993-09-28 Perforation Treatment Performed - Chemical Squeeze
1993-09-28 Perforation Treatment Performed - Jet Perforation
1993-09-28 Well Log Performed
1993-10-01 Perforation Treatment Performed - Cement Squeeze
1993-10-03 Perforation Treatment Performed - Jet Perforation
1993-10-03 Well Log Performed
1997-09-25 Perforation Treatment Performed - Jet Perforation
1997-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-15 Well Log Performed
1999-10-18 Perforation Treatment Performed - Jet Perforation
1999-10-18 Well Log Performed
1999-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-19 Well Began Production
1999-11-19 Well Fluid changed to Crude Oil
1999-11-19 Well Mode changed to Pumping
2003-05-24 Well Log Performed
2003-06-06 Well Log Performed
2005-03-04 Perforation Treatment Performed - Cement Squeeze
2005-03-04 Plug Back Performed
2005-03-30 Perforation Treatment Performed - Jet Perforation
2005-03-31 Perforation Treatment Performed - Casing Patch (Over Perfs)
2005-05-03 Well Fluid changed to Crude Oil
2005-05-03 Well Mode changed to Abandoned Zone
2005-05-24 Perforation Treatment Performed - Jet Perforation
2005-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-11-24 Perforation Treatment Performed - Jet Perforation
2005-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-03-31 Well Log Performed
2006-07-24 Perforation Treatment Performed - Jet Perforation
2006-07-24 Well Log Performed
2006-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-03-27 Perforation Treatment Performed - Jet Perforation
2007-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-08-22 Perforation Treatment Performed - Jet Perforation
2007-08-22 Well Log Performed
2007-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-01-16 Well Log Performed
2008-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-18 Well Log Performed
2011-01-28 Well Log Performed
2011-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-03 Perforation Treatment Performed - Jet Perforation
2011-02-03 Plug Back Performed
2011-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-04 Perforation Treatment Performed - Remedial Casing
2011-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-06 Perforation Treatment Performed - Jet Perforation
2011-02-06 Perforation Treatment Performed - Remedial Casing
2011-02-08 Perforation Treatment Performed - Jet Perforation
2011-02-08 Well Log Performed
2011-02-09 Perforation Treatment Performed - Jet Perforation
2011-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-17 Perforation Treatment Performed - Cement Plug
2011-02-17 Perforation Treatment Performed - Remedial Casing
2011-02-18 Perforation Treatment Performed - Jet Perforation
2011-02-18 Well Log Performed
2011-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-19 Perforation Treatment Performed - Remedial Casing
2012-03-13 Well Abandoned
2012-03-13 Well Fluid changed to Crude Oil
2012-03-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-10-09 Open Hole/Barefoot Completion 1804.00 2026.50 0
1990-11-07 Perforation 1830.00 1830.50 13
1990-11-07 Perforation 1996.00 1997.00 13
1990-11-07 Perforation 1999.00 2000.00 13
1990-11-07 Perforation 2002.00 2003.00 13
1990-11-08 Acid Treatment 1996.00 2003.00 0
1990-11-09 Cement Squeeze 1993.00 1994.00 0
1990-11-12 Perforation 1996.00 1997.00 13
1990-11-12 Perforation 1999.00 2000.00 13
1990-11-12 Perforation 2002.00 2003.00 13
1990-11-12 Acid Treatment 1999.00 2003.00 0
1986-11-09 Cement Squeeze 1804.00 2026.50 0
1990-11-13 Cement Squeeze 1920.00 1920.50 0
1990-11-15 Cement Squeeze 1993.00 1994.00 0
1990-11-18 Acid Treatment 1830.00 2003.00 0
1993-09-28 Perforation 1979.10 1979.40 24
1993-09-28 Chemical Squeeze 1977.40 1979.40 0
1993-09-28 Cement Squeeze 1977.40 1979.40 0
1993-10-01 Cement Squeeze 1977.40 1979.40 0
1993-10-03 Perforation 1997.10 1997.60 13
1997-09-25 Perforation 1997.20 2000.20 20
1997-09-26 Acid Treatment 1997.20 2000.20 0
1986-11-20 Perforation 1983.60 1984.10 8
1999-10-15 Packing Device Capped w/Cement 1826.00 1827.50 0
1999-10-18 Perforation 1737.00 1739.50 17
1999-10-18 Perforation 1731.50 1733.00 17
1999-10-18 Perforation 1717.00 1719.00 17
1999-10-19 Acid Treatment 1717.00 1739.50 0
2005-03-04 Cement Squeeze 1717.00 1739.50 0
2005-03-30 Perforation 1830.00 1830.50 13
2005-03-30 Perforation 1996.00 1997.00 13
2005-03-30 Perforation 1999.00 2000.00 13
2005-03-30 Perforation 2002.00 2003.00 13
1986-11-21 Acid Treatment 1983.60 1984.10 0
2005-03-31 Casing Patch 1830.00 1830.50 0
2005-05-24 Perforation 1988.00 1992.00 14
2005-05-26 Acid Treatment 1988.00 1992.00 0
2005-11-24 Perforation 1959.00 1965.00 20
2005-11-25 Acid Treatment 1959.00 1965.00 0
2006-07-24 Perforation 1923.00 1929.00 20
2006-07-25 Acid Treatment 1923.00 1929.00 0
2007-03-27 Perforation 1892.00 1897.00 13
2007-03-28 Acid Treatment 1892.00 1897.00 0
2007-08-22 Perforation 1822.00 1827.00 13
1988-02-19 Cement Squeeze 1983.60 1984.10 0
2007-08-22 Perforation 1859.00 1865.00 13
2007-08-23 Acid Treatment 1822.00 1865.00 0
2008-01-18 Acid Treatment 1822.00 1827.00 0
2011-02-03 Packing Device Capped w/Cement 1360.00 1810.00 0
2011-02-03 Perforation 707.80 708.80 17
2011-02-04 Remedial Casing Cementing 707.80 708.80 0
2011-02-04 Packing Device Capped w/Cement 686.00 696.00 0
2011-02-06 Perforation 452.00 453.00 17
2011-02-06 Remedial Casing Cementing 452.00 453.00 0
2011-02-06 Packing Device Capped w/Cement 430.00 440.00 0
1988-02-21 Perforation 1920.00 1920.50 14
2011-02-08 Perforation 398.00 399.00 17
2011-02-08 Perforation 366.00 367.00 17
2011-02-09 Perforation 331.00 332.00 17
2011-02-09 Perforation 302.00 303.00 17
2011-02-17 Remedial Casing Cementing 302.00 303.00 0
2011-02-17 Cement Plug 320.00 399.00 0
2011-02-17 Packing Device Capped w/Cement 275.00 293.00 0
2011-02-18 Perforation 241.00 242.00 17
2011-02-19 Remedial Casing Cementing 241.00 242.00 0
2011-02-19 Packing Device Capped w/Cement 220.00 230.00 0
1988-02-21 Perforation 1993.00 1994.00 14
1988-02-22 Acid Treatment 1920.00 1994.00 0
1990-10-31 Cement Squeeze 1920.00 1920.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 923 0.0 0.0 0.0
2000 8275 0.0 0.0 0.0
2001 8720 0.0 0.0 0.0
2002 7829 0.0 0.0 0.0
2003 7511 0.0 0.0 0.0
2004 8709 0.0 0.0 0.0
2005 1037 0.0 0.0 0.0

For data sources see[5]

References