X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272115000

Well Details

Well ID: 0484272115000
Loading map...
Location: 00/15-21-048-27W4/0
Location Alias: 00/15-21-48-27 W4M
Location Alias 2: 00/15-21-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 21
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE CPR B-3
Operator Name: Imperial Oil Resources Limited
License Number: 0008143
License Date: 1954-06-21
License Status: Abandoned
Spud Date: 1954-06-30
Final Drill Date: 1954-10-01
Well Total Depth: 2906.90 m
Surface Hole Latitude: 53.161365
Surface Hole Longitude: -113.887611

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-21 Obtained License
1954-08-04 Well Log Performed
1954-08-21 Production Casing Operation Performed
1954-09-30 Drill Stem Test Performed
1954-10-01 Finished Drilling
1954-10-01 Perforation Treatment Performed - Open-Hole Completion
1954-10-01 Well Mode changed to Drilled and Cased
1954-10-06 Perforation Treatment Performed - Bullet Perforation
1954-10-08 Well Began Production
1954-10-08 Well Fluid changed to Crude Oil
1954-10-08 Well Mode changed to Flowing
1971-03-28 Well Log Performed
1971-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-07-02 Well Began Injection
1971-07-02 Well Fluid changed to Water
1971-07-02 Well Type changed to Injection
1972-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-01 Well Fluid changed to Water
1989-06-01 Well Mode changed to Suspended
1989-06-01 Well Type changed to Injection
1994-06-29 Well Fluid changed to Water
1994-06-29 Well Type changed to Injection
1997-02-01 Well Fluid changed to Water
1997-02-01 Well Mode changed to Suspended
1997-02-01 Well Type changed to Injection
1997-09-30 Perforation Treatment Performed - Jet Perforation
1997-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-01 Well Fluid changed to Crude Oil
1998-01-01 Well Mode changed to Flowing
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-09-14 Well Log Performed
2011-10-19 Well Log Performed
2011-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-20 Perforation Treatment Performed - Jet Perforation
2011-10-20 Plug Back Performed
2011-10-20 Well Fluid changed to Crude Oil
2011-10-20 Well Mode changed to Abandoned Zone
2011-10-21 Perforation Treatment Performed - Cement Plug
2011-10-21 Perforation Treatment Performed - Remedial Casing
2011-10-22 Perforation Treatment Performed - Jet Perforation
2011-10-22 Well Log Performed
2011-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-23 Perforation Treatment Performed - Cement Plug
2011-10-23 Perforation Treatment Performed - Remedial Casing
2011-10-24 Perforation Treatment Performed - Jet Perforation
2011-10-24 Well Log Performed
2011-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-25 Perforation Treatment Performed - Cement Plug
2011-10-25 Perforation Treatment Performed - Remedial Casing
2012-11-16 Well Abandoned
2012-11-16 Well Fluid changed to Crude Oil
2012-11-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-10-01 Open Hole/Barefoot Completion 2015.30 2100.00 0
1997-10-09 Acid Treatment 1996.20 1996.70 0
1997-10-10 Acid Treatment 1988.50 1993.10 0
2011-10-20 Packing Device Capped w/Cement 948.00 1990.00 0
2011-10-20 Perforation 719.50 720.50 26
2011-10-21 Remedial Casing Cementing 719.50 720.50 0
2011-10-21 Cement Plug 598.00 948.00 0
2011-10-22 Perforation 455.40 456.40 17
2011-10-23 Remedial Casing Cementing 455.40 456.40 0
2011-10-23 Cement Plug 445.50 456.40 0
2011-10-23 Packing Device Capped w/Cement 437.00 455.00 0
1954-10-06 Bullet Perforation 1988.50 1993.10 20
2011-10-24 Perforation 391.00 392.00 17
2011-10-24 Perforation 354.00 355.00 17
2011-10-24 Perforation 316.00 317.00 17
2011-10-24 Perforation 242.00 243.00 17
2011-10-24 Perforation 209.00 210.00 17
2011-10-24 Perforation 197.00 198.00 17
2011-10-25 Remedial Casing Cementing 197.00 392.00 0
2011-10-25 Cement Plug 187.50 437.00 0
2011-10-25 Packing Device Capped w/Cement 179.00 187.00 0
1971-03-30 Acid Treatment 1988.50 1993.10 0
1972-10-02 Acid Treatment 1988.50 1993.10 0
1997-09-30 Perforation 1996.20 1996.70 16
1997-09-30 Perforation 1999.70 2000.20 16
1997-09-30 Perforation 2003.70 2004.20 16
1997-10-01 Acid Treatment 2003.70 2004.20 0
1997-10-07 Acid Treatment 1999.70 2000.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1998 6703 0.0 0.0 0.0
1999 1905 0.0 0.0 0.0
2000 1112 0.0 0.0 0.0
2001 273 0.0 0.0 0.0
2003 941 0.0 0.0 0.0
2004 1606 0.0 0.0 0.0
2005 5287 0.0 0.0 0.0

For data sources see[5]

References