X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271601000

Well Details

Well ID: 0484271601000
Loading map...
Location: 00/01-16-048-27W4/0
Location Alias: 00/01-16-48-27 W4M
Location Alias 2: 00/01-16-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO C6 WIZARD 1-16MU-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0004693
License Date: 1952-05-21
License Status: Abandoned
Spud Date: 1952-05-21
Final Drill Date: 1952-07-03
Well Total Depth: 2143.80 m
Surface Hole Latitude: 53.136075
Surface Hole Longitude: -113.881567

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-05-21 Obtained License
1952-06-13 Drill Stem Test Performed
1952-06-14 Drill Stem Test Performed
1952-06-15 Drill Stem Test Performed
1952-06-19 Drill Stem Test Performed
1952-06-30 Production Casing Operation Performed
1952-07-03 Finished Drilling
1952-07-03 Perforation Treatment Performed - Open-Hole Completion
1952-07-03 Well Mode changed to Drilled and Cased
1952-07-06 Well Began Production
1952-07-06 Well Fluid changed to Crude Oil
1952-07-06 Well Mode changed to Flowing
1958-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-29 Perforation Treatment Performed - Jet Perforation
1959-01-03 Well Fluid changed to Crude Oil
1959-01-03 Well Mode changed to Flowing
1959-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-25 Perforation Treatment Performed - Cement Squeeze
1968-05-28 Perforation Treatment Performed - Cement Squeeze
1968-05-28 Well Fluid changed to Crude Oil
1968-05-28 Well Mode changed to Flowing
1971-06-05 Perforation Treatment Performed - Open-Hole Completion
1971-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-11 Perforation Treatment Performed - Open-Hole Completion
1982-06-21 Perforation Treatment Performed - Chemical Squeeze
1983-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-01 Well Log Performed
1985-09-05 Liner Casing Operation Performed
1985-09-05 Perforation Treatment Performed - Cement Squeeze
1985-09-05 Perforation Treatment Performed - Open-Hole Completion
1985-09-09 Perforation Treatment Performed - Jet Perforation
1985-09-09 Well Log Performed
1985-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-13 Perforation Treatment Performed - Cement Squeeze
1986-05-20 Well Log Performed
1986-11-19 Well Log Performed
1987-04-29 Well Log Performed
1987-07-22 Perforation Treatment Performed - Jet Perforation
1987-07-23 Well Log Performed
1988-06-05 Perforation Treatment Performed - Cement Squeeze
1988-06-06 Perforation Treatment Performed - Jet Perforation
1988-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-07 Well Log Performed
1988-06-10 Perforation Treatment Performed - Acid Wash - No Pressure
1988-06-11 Perforation Treatment Performed - Jet Perforation
1988-06-11 Well Log Performed
1988-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-13 Well Log Performed
1988-06-14 Well Fluid changed to Crude Oil
1988-06-14 Well Mode changed to Gas Lift
1992-11-11 Perforation Treatment Performed - Jet Perforation
1992-11-11 Well Log Performed
1997-11-02 Well Log Performed
1997-11-03 Well Log Performed
1997-11-04 Well Log Performed
1997-11-08 Perforation Treatment Performed - Open-Hole Completion
1997-12-01 Well Began Injection
1997-12-01 Well Fluid changed to Water
1997-12-01 Well Type changed to Injection
1997-12-15 Well Log Performed
2004-01-01 Well Fluid changed to Water
2004-01-01 Well Mode changed to Suspended
2004-01-01 Well Type changed to Injection
2014-09-29 Perforation Treatment Performed - Cement Plug
2014-09-29 Plug Back Performed
2014-09-29 Well Fluid changed to Water
2014-09-29 Well Mode changed to Abandoned Zone
2014-09-29 Well Type changed to Injection
2014-09-30 Well Log Performed
2014-10-01 Perforation Treatment Performed - Jet Perforation
2014-10-01 Well Log Performed
2014-10-02 Perforation Treatment Performed - Cement Plug
2014-10-02 Perforation Treatment Performed - Remedial Casing
2014-10-03 Perforation Treatment Performed - Jet Perforation
2014-10-03 Well Log Performed
2014-10-04 Perforation Treatment Performed - Cement Plug
2014-10-04 Perforation Treatment Performed - Remedial Casing
2014-10-05 Perforation Treatment Performed - Cement Plug
2014-10-05 Perforation Treatment Performed - Jet Perforation
2014-10-05 Perforation Treatment Performed - Remedial Casing
2014-10-05 Well Log Performed
2014-10-06 Perforation Treatment Performed - Cement Plug
2014-10-06 Perforation Treatment Performed - Jet Perforation
2014-10-06 Perforation Treatment Performed - Remedial Casing
2014-10-06 Well Log Performed
2014-10-08 Perforation Treatment Performed - Jet Perforation
2014-10-08 Well Log Performed
2014-10-15 Perforation Treatment Performed - Cement Plug
2014-10-15 Perforation Treatment Performed - Remedial Casing
2015-08-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-07-03 Open Hole/Barefoot Completion 1864.20 1909.00 0
1972-10-06 Acid Treatment 1864.20 2000.10 0
1980-11-10 Acid Treatment 1864.20 2000.10 0
1982-06-11 Open Hole/Barefoot Completion 1864.20 2027.70 0
1982-06-21 Chemical Squeeze 1864.20 2027.70 0
1983-05-12 Acid Treatment 1864.20 2027.70 0
1985-09-05 Open Hole/Barefoot Completion 1864.20 2040.00 0
1985-09-05 Cement Squeeze 1864.20 2040.00 0
1985-09-09 Perforation 2000.30 2000.80 13
1985-09-10 Acid Treatment 2000.30 2000.80 0
1985-12-13 Cement Squeeze 1772.00 1815.00 0
1958-11-29 Perforation 1762.40 1766.00 13
1987-07-22 Perforation 2004.30 2004.80 13
1988-06-05 Cement Squeeze 2004.30 2004.80 0
1988-06-06 Perforation 1952.00 1952.50 13
1988-06-06 Perforation 2009.20 2010.20 13
1988-06-07 Acid Treatment 2009.20 2010.20 0
1988-06-10 Acid Wash 2009.20 2010.20 0
1988-06-11 Perforation 2009.20 2010.20 13
1988-06-12 Acid Treatment 2009.20 2010.20 0
1992-11-11 Perforation 2013.30 2013.80 20
1992-11-11 Perforation 2016.80 2017.30 20
1958-11-29 Perforation 1766.30 1768.10 13
1997-11-08 Open Hole/Barefoot Completion 2033.80 2143.80 0
2014-09-29 Cement Plug 1757.40 1989.00 0
2014-10-01 Perforation 1706.90 1707.90 17
2014-10-01 Perforation 1534.70 1535.70 17
2014-10-01 Perforation 1493.50 1494.50 17
2014-10-01 Perforation 1441.70 1442.70 17
2014-10-01 Perforation 1328.60 1329.60 17
2014-10-02 Remedial Casing Cementing 1328.60 1707.90 0
2014-10-02 Cement Plug 1324.40 1757.00 0
2014-10-03 Perforation 1271.30 1272.30 17
1958-11-29 Acid Treatment 1762.40 1768.10 0
2014-10-03 Perforation 700.00 701.00 17
2014-10-04 Remedial Casing Cementing 700.00 1272.30 0
2014-10-04 Cement Plug 685.20 1324.40 0
2014-10-05 Perforation 582.00 583.00 17
2014-10-05 Remedial Casing Cementing 582.00 583.00 0
2014-10-05 Cement Plug 570.20 684.80 0
2014-10-06 Perforation 471.40 472.40 17
2014-10-06 Remedial Casing Cementing 471.40 472.40 0
2014-10-06 Cement Plug 468.40 570.00 0
2014-10-08 Perforation 463.00 464.00 17
1959-10-30 Acid Treatment 1762.40 1768.10 0
2014-10-08 Perforation 441.00 442.00 17
2014-10-08 Perforation 415.00 416.00 17
2014-10-08 Perforation 345.00 346.00 17
2014-10-08 Perforation 322.00 323.00 17
2014-10-08 Perforation 270.00 271.00 17
2014-10-08 Perforation 245.00 246.00 17
2014-10-08 Perforation 222.00 223.00 17
2014-10-08 Perforation 201.00 202.00 17
2014-10-08 Perforation 193.00 194.00 17
2014-10-15 Remedial Casing Cementing 193.00 464.00 0
1968-05-25 Cement Squeeze 1762.40 1768.10 0
2014-10-15 Cement Plug 185.40 468.00 0
2014-10-15 Cement Plug 164.50 185.00 0
1968-05-28 Cement Squeeze 1762.40 1768.10 0
1971-06-05 Open Hole/Barefoot Completion 1864.20 2000.10 0
1971-06-25 Acid Treatment 1864.20 2000.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6806 0.0 0.0 0.0
1968 6723 0.0 0.0 0.0
1969 6386 0.0 0.0 0.0
1970 7300 0.0 0.0 0.0
1971 6220 0.0 0.0 0.0
1972 7588 0.0 0.0 0.0
1973 8155 0.0 0.0 0.0
1974 6103 0.0 0.0 0.0
1975 5422 0.0 0.0 0.0
1976 4672 0.0 0.0 0.0
1977 3693 0.0 0.0 0.0
1978 4704 0.0 0.0 0.0
1979 6188 0.0 0.0 0.0
1980 7601 0.0 0.0 0.0
1981 6944 0.0 0.0 0.0
1982 4432 0.0 0.0 0.0
1983 6418 0.0 0.0 0.0
1984 8170 0.0 0.0 0.0
1985 7130 0.0 0.0 0.0
1986 6951 0.0 0.0 0.0
1987 5012 0.0 0.0 0.0
1988 6396 0.0 0.0 0.0
1989 8143 0.0 0.0 0.0
1990 8329 0.0 0.0 0.0
1991 7426 0.0 0.0 0.0
1992 6296 0.0 0.0 0.0
1993 3768 0.0 0.0 0.0
1994 3278 0.0 0.0 0.0
1995 4670 0.0 0.0 0.0
1996 6941 0.0 0.0 0.0
1997 4557 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References