X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484270915000

Well Details

Well ID: 0484270915000
Loading map...
Location: 00/15-09-048-27W4/0
Location Alias: 00/15-09-48-27 W4M
Location Alias 2: 00/15-09-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 09
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE C.P.R. NO. G-4
Operator Name: Imperial Oil Resources Limited
License Number: 0005346
License Date: 1952-09-22
License Status: Abandoned
Spud Date: 1952-09-23
Final Drill Date: 1952-10-23
Well Total Depth: 2036.00 m
Surface Hole Latitude: 53.132274
Surface Hole Longitude: -113.887578

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-22 Obtained License
1952-10-20 Production Casing Operation Performed
1952-10-23 Finished Drilling
1952-10-23 Perforation Treatment Performed - Open-Hole Completion
1952-10-23 Well Mode changed to Drilled and Cased
1952-10-26 Well Began Production
1952-10-26 Well Fluid changed to Crude Oil
1952-10-26 Well Mode changed to Flowing
1959-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1959-05-06 Perforation Treatment Performed - Jet Perforation
1959-05-06 Well Fluid changed to Crude Oil
1959-05-06 Well Mode changed to Abandoned Zone
1959-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-05-11 Perforation Treatment Performed - Cement Squeeze
1959-05-13 Perforation Treatment Performed - Bullet Perforation
1959-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-10-29 Perforation Treatment Performed - Cement Squeeze
1971-11-17 Perforation Treatment Performed - Condensate Squeeze
1971-11-17 Perforation Treatment Performed - Open-Hole Completion
1971-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-20 Well Began Injection
1972-01-20 Well Fluid changed to Solvent
1972-01-20 Well Type changed to Injection
1984-01-07 Well Log Performed
1984-01-11 Perforation Treatment Performed - Open-Hole Completion
1984-01-11 Well Log Performed
1984-02-20 Well Log Performed
1984-05-09 Well Log Performed
1984-08-24 Well Log Performed
1984-10-06 Well Log Performed
1984-10-10 Well Log Performed
1984-10-11 Well Log Performed
1984-11-09 Well Log Performed
1984-11-21 Well Log Performed
1985-06-10 Well Log Performed
1985-08-27 Well Log Performed
1985-11-18 Well Log Performed
1986-06-06 Well Log Performed
1986-08-18 Well Log Performed
1986-11-13 Well Log Performed
1986-12-02 Well Log Performed
1986-12-23 Well Log Performed
1987-01-13 Well Log Performed
1987-02-10 Well Log Performed
1987-06-08 Well Log Performed
1987-08-11 Well Log Performed
1987-11-10 Well Log Performed
1988-02-22 Well Log Performed
1988-06-02 Well Log Performed
1988-08-23 Well Log Performed
1988-11-10 Well Log Performed
1989-02-20 Well Log Performed
1989-02-24 Well Log Performed
1989-05-24 Well Log Performed
1989-08-10 Well Log Performed
1990-02-13 Well Log Performed
1990-05-29 Well Log Performed
1990-08-07 Well Log Performed
1991-05-23 Well Log Performed
1991-09-05 Well Log Performed
1991-11-25 Well Log Performed
1992-05-12 Well Log Performed
1992-08-19 Well Log Performed
1992-11-30 Well Log Performed
1993-06-21 Well Log Performed
1993-07-19 Well Log Performed
1994-05-05 Well Log Performed
1994-07-06 Well Log Performed
1994-08-04 Well Log Performed
1994-09-06 Well Log Performed
1994-10-05 Well Log Performed
1995-02-14 Well Log Performed
1995-03-14 Well Log Performed
1995-09-14 Well Log Performed
1996-07-31 Well Log Performed
1996-11-25 Well Log Performed
1997-04-24 Well Log Performed
1997-10-31 Well Log Performed
1998-02-03 Well Log Performed
1998-03-23 Well Log Performed
1998-05-26 Well Log Performed
1998-11-10 Well Log Performed
1999-02-09 Well Log Performed
1999-05-21 Well Log Performed
1999-09-28 Well Log Performed
1999-12-14 Well Log Performed
2000-03-09 Well Log Performed
2000-06-13 Well Log Performed
2000-10-15 Well Log Performed
2000-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-12-15 Well Log Performed
2001-03-23 Well Log Performed
2001-07-03 Well Log Performed
2001-12-12 Well Log Performed
2002-06-19 Well Log Performed
2002-09-26 Well Log Performed
2002-11-26 Well Log Performed
2003-02-12 Well Fluid changed to Gas
2003-02-12 Well Mode changed to Flowing
2003-02-20 Well Log Performed
2003-06-24 Well Log Performed
2003-09-19 Well Log Performed
2003-11-27 Well Log Performed
2004-02-14 Well Log Performed
2004-02-26 Well Log Performed
2004-05-28 Well Log Performed
2004-09-09 Well Log Performed
2004-12-02 Well Log Performed
2005-02-28 Well Log Performed
2005-03-01 Well Log Performed
2005-04-01 Well Type changed to Observation
2005-05-30 Well Log Performed
2005-05-31 Well Log Performed
2005-08-31 Well Log Performed
2005-09-02 Well Log Performed
2006-03-21 Perforation Treatment Performed - Jet Perforation
2006-03-21 Well Log Performed
2006-04-07 Well Fluid changed to Crude Oil
2006-04-07 Well Mode changed to Flowing
2006-10-10 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2012-11-20 Well Log Performed
2012-11-21 Well Log Performed
2012-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-24 Perforation Treatment Performed - Cement Squeeze
2012-11-24 Perforation Treatment Performed - Jet Perforation
2012-11-24 Perforation Treatment Performed - Remedial Casing
2012-11-24 Plug Back Performed
2012-11-24 Well Fluid changed to Crude Oil
2012-11-24 Well Log Performed
2012-11-24 Well Mode changed to Abandoned Zone
2012-11-27 Perforation Treatment Performed - Jet Perforation
2012-11-27 Well Log Performed
2012-11-28 Perforation Treatment Performed - Cement Plug
2012-11-28 Perforation Treatment Performed - Remedial Casing
2012-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-05-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-23 Open Hole/Barefoot Completion 1868.40 1898.60 0
1971-11-17 Open Hole/Barefoot Completion 1868.40 1898.60 0
1971-11-17 Condensate Squeeze 1868.40 1898.60 0
1971-11-19 Acid Treatment 1868.40 1898.60 0
1984-01-11 Open Hole/Barefoot Completion 1868.40 2036.00 0
2000-10-17 Acid Treatment 1993.00 1997.20 0
2000-10-18 Acid Treatment 1993.00 1997.20 0
2006-03-21 Perforation 1869.00 1872.00 20
2012-11-24 Cement Squeeze 1868.40 2036.00 0
2012-11-24 Perforation 751.00 752.00 17
2012-11-24 Remedial Casing Cementing 751.00 752.00 0
1959-05-06 Packing Device Capped w/Cement 1822.70 1822.70 0
2012-11-24 Packing Device Capped w/Cement 611.00 1861.50 0
2012-11-27 Perforation 485.90 486.90 17
2012-11-27 Perforation 447.00 448.00 17
2012-11-27 Perforation 434.50 435.50 17
2012-11-27 Perforation 384.00 385.00 17
2012-11-27 Perforation 356.00 357.00 17
2012-11-27 Perforation 344.50 345.50 17
2012-11-27 Perforation 331.00 332.00 17
2012-11-27 Perforation 304.00 305.00 17
2012-11-27 Perforation 282.00 283.00 17
1959-05-06 Perforation 1787.00 1792.20 13
2012-11-27 Perforation 254.00 255.00 17
2012-11-27 Perforation 232.00 233.00 17
2012-11-27 Perforation 200.00 201.00 17
2012-11-28 Remedial Casing Cementing 200.00 486.90 0
2012-11-28 Cement Plug 473.00 486.90 0
2012-11-30 Packing Device Capped w/Cement 197.70 472.50 0
2012-11-30 Packing Device Capped w/Cement 181.00 197.20 0
1959-05-07 Acid Treatment 1787.00 1792.20 0
1959-05-11 Acid Treatment 1787.00 1792.20 0
1959-05-11 Cement Squeeze 1787.00 1792.20 0
1959-05-13 Bullet Perforation 1781.90 1783.70 13
1959-05-14 Acid Treatment 1781.90 1783.70 0
1971-10-29 Cement Squeeze 1781.90 1783.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 1704 0.0 0.0 0.0
2006 5677 0.0 0.0 0.0
2007 8533 0.0 0.0 0.0
2008 776 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-01 No Incident Encountered 0.00 0.00

For data sources see[6]

References