X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484270910002

Well Details

Well ID: 0484270910002
Loading map...
Location: 00/10-09-048-27W4/2
Location Alias: 00/10-09-48-27 W4M
Location Alias 2: 00/10-09-048-27 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 09
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE CPR NO. G-7
Operator Name: Imperial Oil Resources Limited
License Number: 0005819
License Date: 1952-12-13
License Status: Abandoned
Spud Date: 1952-12-23
Final Drill Date: 1953-01-26
Well Total Depth: 2050.50 m
Surface Hole Latitude: 53.128656
Surface Hole Longitude: -113.887574

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-13 Obtained License
1953-01-20 Production Casing Operation Performed
1953-01-26 Finished Drilling
1953-01-26 Perforation Treatment Performed - Open-Hole Completion
1953-01-26 Well Mode changed to Drilled and Cased
1958-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-19 Perforation Treatment Performed - Jet Perforation
1959-01-03 Well Began Production
1959-01-03 Well Fluid changed to Crude Oil
1959-01-03 Well Mode changed to Pumping
1971-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-24 Perforation Treatment Performed - Cement Squeeze
1972-02-25 Perforation Treatment Performed - Cement Squeeze
1972-02-27 Well Fluid changed to Crude Oil
1972-02-27 Well Mode changed to Abandoned Zone
1975-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-20 Perforation Treatment Performed - Open-Hole Completion
1976-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-11 Well Log Performed
1984-03-13 Perforation Treatment Performed - Open-Hole Completion
1984-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-14 Well Log Performed
1986-09-07 Well Log Performed
1988-02-27 Well Log Performed
1989-11-23 Well Log Performed
1991-05-16 Well Log Performed
1992-10-20 Perforation Treatment Performed - Open-Hole Completion
1992-10-22 Well Log Performed
1992-10-24 Well Log Performed
1992-11-05 Liner Casing Operation Performed
1992-11-05 Perforation Treatment Performed - Cement Squeeze
1992-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-08 Perforation Treatment Performed - Jet Perforation
1992-11-08 Well Log Performed
1994-01-10 Perforation Treatment Performed - Chemical Squeeze
1994-01-12 Perforation Treatment Performed - Jet Perforation
1994-01-12 Well Log Performed
1994-01-13 Perforation Treatment Performed - Cement Squeeze
1994-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-15 Perforation Treatment Performed - Jet Perforation
1994-01-15 Well Log Performed
1997-05-13 Perforation Treatment Performed - Jet Perforation
1997-05-13 Well Log Performed
1997-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-04-02 Perforation Treatment Performed - Jet Perforation
2007-04-03 Perforation Treatment Performed - Jet Perforation
2007-04-04 Well Log Performed
2011-10-26 Well Log Performed
2012-07-26 Well Log Performed
2012-07-31 Well Log Performed
2012-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-01 Perforation Treatment Performed - Jet Perforation
2012-08-01 Plug Back Performed
2012-08-04 Perforation Treatment Performed - Remedial Casing
2012-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-05 Perforation Treatment Performed - Jet Perforation
2012-08-05 Perforation Treatment Performed - Remedial Casing
2012-08-05 Well Log Performed
2012-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-08 Perforation Treatment Performed - Jet Perforation
2012-08-08 Perforation Treatment Performed - Remedial Casing
2012-08-08 Well Log Performed
2012-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-14 Perforation Treatment Performed - Cement Plug
2013-05-16 Well Abandoned
2013-05-16 Well Fluid changed to Crude Oil
2013-05-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-01-26 Open Hole/Barefoot Completion 1870.60 2017.80 0
1976-05-19 Acid Treatment 1870.60 2017.80 0
1984-03-13 Open Hole/Barefoot Completion 1870.60 2045.00 0
1984-03-21 Acid Treatment 1870.60 2045.00 0
1992-10-20 Open Hole/Barefoot Completion 1870.60 2050.50 0
1992-11-05 Cement Squeeze 1870.60 2050.50 0
1992-11-08 Perforation 2012.00 2014.00 20
1992-11-08 Perforation 2017.00 2019.00 20
1992-11-08 Perforation 2021.00 2023.00 20
1992-11-08 Acid Treatment 2012.00 2023.00 0
1994-01-10 Chemical Squeeze 2012.00 2023.00 0
1958-12-18 Packing Device Capped w/Cement 1837.90 1899.50 0
1994-01-12 Perforation 2012.00 2012.30 99
1994-01-12 Perforation 2013.70 2014.00 99
1994-01-12 Perforation 2018.70 2019.00 99
1994-01-13 Cement Squeeze 2012.00 2014.00 0
1994-01-15 Perforation 2012.00 2014.00 13
1994-01-15 Acid Treatment 2012.00 2014.00 0
1997-05-13 Perforation 2020.00 2022.00 20
1997-06-01 Acid Treatment 2020.00 2022.00 0
2007-04-02 Perforation 1871.00 1877.00 13
2007-04-02 Perforation 1881.50 1886.00 13
1958-12-19 Perforation 1781.90 1783.40 13
2007-04-03 Perforation 1902.50 1908.50 13
2007-04-03 Perforation 1925.00 1931.00 13
2012-08-01 Packing Device Capped w/Cement 803.00 1865.00 0
2012-08-01 Perforation 724.00 725.00 17
2012-08-04 Remedial Casing Cementing 724.00 725.00 0
2012-08-05 Packing Device Capped w/Cement 478.50 498.00 0
2012-08-05 Perforation 490.90 491.90 17
2012-08-05 Remedial Casing Cementing 490.90 491.90 0
2012-08-07 Packing Device Capped w/Cement 469.50 478.20 0
2012-08-08 Perforation 429.00 430.00 17
1958-12-19 Acid Treatment 1781.90 1783.40 0
2012-08-08 Perforation 370.00 371.00 17
2012-08-08 Perforation 316.00 317.00 17
2012-08-08 Perforation 280.00 281.00 17
2012-08-08 Perforation 254.50 255.50 17
2012-08-08 Perforation 226.00 227.00 17
2012-08-08 Perforation 205.00 206.00 17
2012-08-08 Perforation 199.00 200.00 17
2012-08-08 Remedial Casing Cementing 199.00 430.00 0
2012-08-14 Cement Plug 21.60 469.00 0
2012-08-14 Packing Device Capped w/Cement 11.00 21.00 0
1971-01-28 Acid Treatment 1781.90 1783.40 0
1972-02-24 Cement Squeeze 1781.90 1783.40 0
1972-02-25 Cement Squeeze 1781.90 1783.40 0
1975-06-20 Open Hole/Barefoot Completion 1870.60 2017.80 0
1975-06-20 Acid Treatment 1870.60 2017.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8759 0.0 0.0 0.0
1968 8777 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 7271 0.0 0.0 0.0
1971 7026 0.0 0.0 0.0
1972 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References