X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484251214020

Well Details

Well ID: 0484251214020
Loading map...
Location: 02/14-12-048-25W4/0
Location Alias: 02/14-12-48-25 W4M
Location Alias 2: 02/14-12-048-25 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 25
Section: 12
County/Municipality: Leduc County
Well Name: Canlin LEDUC-WB 14-12-48-25
Operator Name: Canlin Energy Corporation
License Number: 0123046
License Date: 1986-03-21
License Status: Abandoned
Spud Date: 1986-03-23
Final Drill Date: 1986-03-29
Well Total Depth: 1398.40 m
Surface Hole Latitude: 53.130884
Surface Hole Longitude: -113.525696

For data sources see[1][2]

Well History

Date Event
1986-03-21 Obtained License
1986-03-24 Surface Casing Operation Performed
1986-03-29 Finished Drilling
1986-03-29 Well Log Performed
1986-03-30 Production Casing Operation Performed
1986-03-30 Rig Released
1986-03-30 Well Mode changed to Drilled and Cased
1986-04-02 Perforation Treatment Performed - Open-Hole Completion
1986-04-07 Well Log Performed
1986-04-08 Perforation Treatment Performed - Jet Perforation
1986-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-18 Perforation Treatment Performed - Jet Perforation
1986-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-30 Well Began Production
1986-04-30 Well Fluid changed to Crude Oil
1986-04-30 Well Mode changed to Pumping
1988-02-01 Well Fluid changed to Crude Oil
1988-02-01 Well Mode changed to Suspended
1994-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-19 Perforation Treatment Performed - Cement Squeeze
1994-11-20 Well Log Performed
1994-12-09 Well Log Performed
1994-12-10 Perforation Treatment Performed - Jet Perforation
1998-11-01 Well Fluid changed to Crude Oil
1998-11-01 Well Mode changed to Abandoned and Re-entered
1998-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-02 Plug Back Performed
2004-03-20 Well Log Performed
2008-08-06 Well Log Performed
2018-08-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-04-02 Open Hole/Barefoot Completion 1396.00 1398.40 0
1986-04-08 Perforation 1384.50 1385.00 13
1986-04-12 Acid Treatment 1384.50 1385.00 0
1986-04-18 Perforation 1384.50 1385.00 13
1986-04-19 Acid Treatment 1384.50 1385.00 0
1994-11-19 Cement Squeeze 1384.50 1398.40 0
1994-11-19 Packing Device Capped w/Cement 1383.70 1393.50 0
1994-12-10 Perforation 1380.00 1382.00 13
1998-11-02 Packing Device Capped w/Cement 1364.00 1372.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 24 0.0 0.0 0.0
1987 4264 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References