X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484213407000

Well Details

Well ID: 0484213407000
Loading map...
Location: 00/07-34-048-21W4/0
Location Alias: 00/07-34-48-21 W4M
Location Alias 2: 00/07-34-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 34
County/Municipality: Camrose County
Well Name: CABRE JOARCAM #7-34
Operator Name: Enerplus Corporation
License Number: 0004797
License Date: 1952-06-07
License Status: RecCertified
Spud Date: 1952-07-12
Final Drill Date: 1952-07-18
Well Total Depth: 1010.70 m
Surface Hole Latitude: 53.183268
Surface Hole Longitude: -112.986031

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-06-07 Obtained License
1952-07-18 Finished Drilling
1952-07-18 Production Casing Operation Performed
1952-07-18 Well Mode changed to Drilled and Cased
1952-07-21 Perforation Treatment Performed - Abrasa-Jet Perforation
1952-07-21 Perforation Treatment Performed - Jet Perforation
1952-08-14 Well Began Production
1952-08-14 Well Fluid changed to Crude Oil
1952-08-14 Well Mode changed to Pumping
1984-03-07 Perforation Treatment Performed - Jet Perforation
1984-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-23 Perforation Treatment Performed - Jet Perforation
1987-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-11 Well Fluid changed to Crude Oil
1989-04-11 Well Mode changed to Suspended
1990-03-20 Well Log Performed
1990-03-21 Perforation Treatment Performed - Cement Squeeze
1990-03-21 Plug Back Performed
1990-03-21 Well Fluid changed to Crude Oil
1990-03-21 Well Mode changed to Abandoned Zone
1990-03-22 Perforation Treatment Performed - Jet Perforation
1990-03-22 Well Log Performed
1990-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-28 Perforation Treatment Performed - Jet Perforation
1991-10-28 Plug Back Performed
1991-10-28 Well Log Performed
1991-10-29 Perforation Treatment Performed - Cement Plug
1991-10-29 Perforation Treatment Performed - Remedial Casing
1991-10-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-07-21 Perforation 992.40 995.50 13
1991-10-28 Packing Device Capped w/Cement 957.30 967.30 0
1991-10-28 Perforation 199.00 200.00 13
1991-10-29 Remedial Casing Cementing 199.00 200.00 0
1991-10-29 Cement Plug 172.60 200.00 0
1952-07-21 Hydra Jet Perforation 994.00 994.00 0
1984-03-07 Perforation 990.40 991.90 13
1984-03-08 Acid Treatment 990.40 995.50 0
1987-06-23 Perforation 986.40 990.40 13
1987-06-24 Acid Treatment 986.40 990.40 0
1990-03-21 Cement Squeeze 986.40 995.50 0
1990-03-22 Perforation 980.50 982.80 13
1990-03-26 Acid Treatment 980.50 982.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4187 0.0 0.0 0.0
1968 4636 0.0 0.0 0.0
1969 1512 0.0 0.0 0.0
1970 2904 0.0 0.0 0.0
1971 3720 0.0 0.0 0.0
1973 4560 0.0 0.0 0.0
1974 8615 0.0 0.0 0.0
1975 8314 0.0 0.0 0.0
1976 8365 0.0 0.0 0.0
1977 3685 0.0 0.0 0.0
1978 168 0.0 0.0 0.0
1981 1940 0.0 0.0 0.0
1982 2882 0.0 0.0 0.0
1983 5580 0.0 0.0 0.0
1984 8138 0.0 0.0 0.0
1985 8336 0.0 0.0 0.0
1986 7713 0.0 0.0 0.0
1987 7726 0.0 0.0 0.0
1988 8373 0.0 0.0 0.0
1989 2299 0.0 0.0 0.0

For data sources see[5]

References