X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484212710000

Well Details

Well ID: 0484212710000
Loading map...
Location: 00/10-27-048-21W4/0
Location Alias: 00/10-27-48-21 W4M
Location Alias 2: 00/10-27-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 27
County/Municipality: Camrose County
Well Name: CABRE JOARCAM 10-27-48-21
Operator Name: Enerplus Corporation
License Number: 0003620
License Date: 1951-10-16
License Status: RecCertified
Spud Date: 1951-11-05
Final Drill Date: 1951-11-13
Well Total Depth: 991.50 m
Surface Hole Latitude: 53.172890
Surface Hole Longitude: -112.985310

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-10-16 Obtained License
1951-11-11 Production Casing Operation Performed
1951-11-13 Finished Drilling
1951-11-13 Perforation Treatment Performed - Open-Hole Completion
1951-11-13 Well Mode changed to Drilled and Cased
1951-11-29 Well Began Production
1951-11-29 Well Fluid changed to Crude Oil
1951-11-29 Well Mode changed to Pumping
1973-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-26 Perforation Treatment Performed - Open-Hole Completion
1983-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-01 Well Fluid changed to Crude Oil
1983-08-01 Well Mode changed to Suspended
1992-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-17 Perforation Treatment Performed - Jet Perforation
1992-07-17 Perforation Treatment Performed - Remedial Casing
1992-07-17 Plug Back Performed
1992-07-17 Well Fluid changed to Crude Oil
1992-07-17 Well Log Performed
1992-07-17 Well Mode changed to Abandoned
1992-07-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-13 Open Hole/Barefoot Completion 988.50 989.70 0
1973-06-06 Acid Treatment 988.50 989.70 0
1983-01-26 Open Hole/Barefoot Completion 988.50 991.50 0
1983-01-27 Acid Treatment 988.50 991.50 0
1992-07-17 Packing Device Capped w/Cement 972.30 980.30 0
1992-07-17 Perforation 161.00 161.50 13
1992-07-17 Remedial Casing Cementing 161.00 161.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6905 0.0 0.0 0.0
1968 8691 0.0 0.0 0.0
1969 7079 0.0 0.0 0.0
1970 8351 0.0 0.0 0.0
1971 7560 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 8712 0.0 0.0 0.0
1974 8759 0.0 0.0 0.0
1975 8656 0.0 0.0 0.0
1976 8675 0.0 0.0 0.0
1977 8647 0.0 0.0 0.0
1978 8567 0.0 0.0 0.0
1979 8627 0.0 0.0 0.0
1980 1464 0.0 0.0 0.0
1982 1302 0.0 0.0 0.0
1983 2982 0.0 0.0 0.0

For data sources see[5]

References