X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484212615020

Well Details

Well ID: 0484212615020
Loading map...
Location: 02/15-26-048-21W4/0
Location Alias: 02/15-26-48-21 W4M
Location Alias 2: 02/15-26-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 26
County/Municipality: Camrose County
Well Name: CABRE JOARCAM 15-26-48-21
Operator Name: Enerplus Corporation
License Number: 0115772
License Date: 1985-07-02
License Status: Suspension
Spud Date: 1985-07-21
Final Drill Date: 1985-07-23
Well Total Depth: 1020.00 m
Surface Hole Latitude: 53.175600
Surface Hole Longitude: -112.961671

For data sources see[1][2]

Well History

Date Event
1985-07-02 Obtained License
1985-07-22 Surface Casing Operation Performed
1985-07-23 Finished Drilling
1985-07-23 Well Mode changed to Drilled and Cased
1985-07-24 Well Log Performed
1985-07-25 Production Casing Operation Performed
1985-07-25 Rig Released
1985-08-03 Perforation Treatment Performed - Jet Perforation
1985-08-03 Well Log Performed
1985-09-19 Well Began Production
1985-09-19 Well Fluid changed to Crude Oil
1985-09-19 Well Mode changed to Pumping
1993-09-27 Perforation Treatment Performed - Cement Squeeze
1993-09-28 Perforation Treatment Performed - Jet Perforation
1993-09-30 Perforation Treatment Performed - Jet Perforation
1993-10-04 Perforation Treatment Performed - Cement Squeeze
1993-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-17 Well Log Performed
1997-08-15 Well Log Performed
1997-10-22 Perforation Treatment Performed - Cement Squeeze
1997-10-22 Well Log Performed
1997-10-23 Perforation Treatment Performed - Jet Perforation
1998-05-27 Well Log Performed
1998-05-28 Well Log Performed
1998-05-29 Perforation Treatment Performed - Jet Perforation
1998-05-29 Well Fluid changed to Crude Oil
1998-05-29 Well Mode changed to Suspended
1999-02-13 Well Fluid changed to Crude Oil
1999-02-13 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-03 Perforation 989.50 990.50 13
1993-09-27 Cement Squeeze 989.50 990.50 0
1993-09-28 Perforation 987.00 989.00 13
1993-09-30 Perforation 994.00 996.00 13
1993-10-04 Cement Squeeze 994.00 996.00 0
1993-10-05 Acid Treatment 987.00 989.00 0
1997-10-22 Cement Squeeze 987.00 989.00 0
1997-10-23 Perforation 984.50 986.00 14
1998-05-29 Perforation 975.50 976.50 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1433 0.0 0.0 0.0
1986 6614 0.0 0.0 0.0
1987 6642 0.0 0.0 0.0
1988 7337 0.0 0.0 0.0
1989 8327 0.0 0.0 0.0
1990 8489 0.0 0.0 0.0
1991 8626 0.0 0.0 0.0
1992 8252 0.0 0.0 0.0
1993 7164 0.0 0.0 0.0
1994 8331 0.0 0.0 0.0
1995 8656 0.0 0.0 0.0
1996 6962 0.0 0.0 0.0
1997 1629 0.0 0.0 0.0
1998 4196 0.0 0.0 0.0

For data sources see[5]

References