X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484212609000

Well Details

Well ID: 0484212609000
Loading map...
Location: 00/09-26-048-21W4/0
Location Alias: 00/09-26-48-21 W4M
Location Alias 2: 00/09-26-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 26
County/Municipality: Camrose County
Well Name: CANDEL JOARCAM 9-26-48-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0005023
License Date: 1952-07-19
License Status: RecCertified
Spud Date: 1952-07-29
Final Drill Date: 1952-08-04
Well Total Depth: 1005.80 m
Surface Hole Latitude: 53.172429
Surface Hole Longitude: -112.955648

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-19 Obtained License
1952-08-04 Finished Drilling
1952-08-04 Production Casing Operation Performed
1952-08-04 Well Mode changed to Drilled and Cased
1952-08-06 Perforation Treatment Performed - Jet Perforation
1952-08-08 Well Began Production
1952-08-08 Well Fluid changed to Crude Oil
1952-08-08 Well Mode changed to Flowing
1954-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-21 Perforation Treatment Performed - Cement Squeeze
1955-01-04 Perforation Treatment Performed - Jet Perforation
1955-01-05 Well Fluid changed to Crude Oil
1955-01-05 Well Mode changed to Pumping
1983-11-08 Perforation Treatment Performed - Jet Perforation
1983-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-24 Perforation Treatment Performed - Jet Perforation
1984-01-24 Well Log Performed
1984-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-01 Well Fluid changed to Crude Oil
1985-07-01 Well Mode changed to Suspended
1986-02-07 Well Log Performed
1992-06-22 Well Log Performed
1992-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-25 Plug Back Performed
1992-06-25 Well Fluid changed to Crude Oil
1992-06-25 Well Mode changed to Abandoned
1992-06-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-06 Perforation 982.10 985.10 13
1992-06-25 Packing Device Capped w/Cement 962.00 970.00 0
1992-06-25 Packing Device Capped w/Cement 176.00 184.00 0
1954-12-21 Acid Treatment 982.10 985.10 0
1954-12-21 Cement Squeeze 982.10 985.10 0
1955-01-04 Perforation 985.40 986.60 20
1983-11-08 Perforation 980.80 983.00 13
1983-11-09 Acid Treatment 980.80 986.60 0
1984-01-24 Perforation 981.10 986.00 13
1984-01-25 Acid Treatment 980.80 986.60 0
1984-12-17 Acid Treatment 980.80 986.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 3243 0.0 0.0 0.0
1981 226 0.0 0.0 0.0
1982 1580 0.0 0.0 0.0
1983 5290 0.0 0.0 0.0
1984 8037 0.0 0.0 0.0
1985 5097 0.0 0.0 0.0

For data sources see[5]

References