X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484212512000

Well Details

Well ID: 0484212512000
Loading map...
Location: 00/12-25-048-21W4/0
Location Alias: 00/12-25-48-21 W4M
Location Alias 2: 00/12-25-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 25
County/Municipality: Camrose County
Well Name: IMP CDR JOAM NO. 12-25V-48-21
Operator Name: Imperial Oil Limited
License Number: 0004484
License Date: 1952-04-09
License Status: RecExempt
Spud Date: 1952-04-18
Final Drill Date: 1952-04-25
Well Total Depth: 1001.90 m
Surface Hole Latitude: 53.172425
Surface Hole Longitude: -112.949326

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-04-09 Obtained License
1952-04-24 Drill Stem Test Performed
1952-04-25 Finished Drilling
1952-04-25 Well Mode changed to Drilled and Cased
1952-04-26 Production Casing Operation Performed
1952-05-11 Perforation Treatment Performed - Bullet Perforation
1952-08-14 Well Began Production
1952-08-14 Well Fluid changed to Crude Oil
1952-08-14 Well Mode changed to Pumping
1955-11-28 Perforation Treatment Performed - Cement Squeeze
1955-11-30 Perforation Treatment Performed - Jet Perforation
1956-12-18 Perforation Treatment Performed - Cement Squeeze
1956-12-23 Perforation Treatment Performed - Jet Perforation
1959-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-05-05 Perforation Treatment Performed - Cement Squeeze
1959-05-14 Perforation Treatment Performed - Jet Perforation
1959-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-06-29 Perforation Treatment Performed - Bullet Perforation
1962-09-23 Perforation Treatment Performed - Cement Plug
1962-09-23 Well Abandoned
1962-09-23 Well Fluid changed to Crude Oil
1962-09-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-05-11 Bullet Perforation 986.90 988.50 13
1959-06-29 Bullet Perforation 987.60 988.80 13
1962-09-23 Cement Plug 965.00 991.20 0
1955-11-28 Cement Squeeze 986.90 988.50 0
1955-11-30 Perforation 985.10 987.90 13
1956-12-18 Cement Squeeze 985.10 987.90 0
1956-12-23 Perforation 986.90 990.00 13
1959-05-05 Acid Treatment 986.90 990.00 0
1959-05-05 Cement Squeeze 986.90 990.00 0
1959-05-14 Perforation 988.50 989.40 13
1959-06-11 Acid Treatment 988.50 989.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References