X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484201809000

Well Details

Well ID: 0484201809000
Loading map...
Location: 00/09-18-048-20W4/0
Location Alias: 00/09-18-48-20 W4M
Location Alias 2: 00/09-18-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 18
County/Municipality: Camrose County
Well Name: IMPERIAL DINANT NO. 9-18V-48-20
Operator Name: Imperial Oil Resources Limited
License Number: 0006785
License Date: 1953-07-21
License Status: Abandoned
Spud Date: 1953-07-29
Final Drill Date: 1953-08-03
Well Total Depth: 996.70 m
Surface Hole Latitude: 53.142754
Surface Hole Longitude: -112.907913

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-21 Obtained License
1953-08-03 Finished Drilling
1953-08-03 Well Mode changed to Drilled and Cased
1953-08-04 Drill Stem Test Performed
1953-08-05 Drill Stem Test Performed
1953-08-05 Production Casing Operation Performed
1953-08-11 Perforation Treatment Performed - Jet Perforation
1953-08-22 Well Began Production
1953-08-22 Well Fluid changed to Crude Oil
1953-08-22 Well Mode changed to Pumping
1960-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-05-02 Perforation Treatment Performed - Cement Squeeze
1960-05-05 Perforation Treatment Performed - Jet Perforation
1961-06-13 Perforation Treatment Performed - Bullet Perforation
1972-09-25 Well Fluid changed to Crude Oil
1972-09-25 Well Mode changed to Suspended
1973-10-25 Perforation Treatment Performed - Cement Plug
1973-10-25 Well Abandoned
1973-10-25 Well Fluid changed to Crude Oil
1973-10-25 Well Mode changed to Abandoned
1973-10-30 Perforation Treatment Performed - Cement Plug
1973-10-31 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-11 Perforation 978.10 979.00 13
1960-05-02 Acid Treatment 978.10 979.00 0
1960-05-02 Cement Squeeze 978.10 979.00 0
1960-05-05 Perforation 979.30 980.20 13
1961-06-13 Bullet Perforation 979.30 981.20 13
1973-10-25 Cement Plug 945.50 986.30 0
1973-10-30 Cement Plug 640.40 678.50 0
1973-10-31 Cement Plug 31.10 198.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 384 0.0 0.0 0.0
1968 1748 0.0 0.0 0.0
1969 3311 0.0 0.0 0.0
1970 7528 0.0 0.0 0.0
1971 3575 0.0 0.0 0.0
1972 254 0.0 0.0 0.0

For data sources see[5]

References