X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484200510000

Well Details

Well ID: 0484200510000
Loading map...
Location: 00/10-05-048-20W4/0
Location Alias: 00/10-05-48-20 W4M
Location Alias 2: 00/10-05-048-20 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 20
Section: 05
County/Municipality: Camrose County
Well Name: IMPERIAL DINANT NO. 10-5V-48-20
Operator Name: Imperial Oil Limited
License Number: 0006373
License Date: 1953-04-30
License Status: RecCertified
Spud Date: 1953-06-03
Final Drill Date: 1953-06-15
Well Total Depth: 1028.70 m
Surface Hole Latitude: 53.113426
Surface Hole Longitude: -112.885182

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-30 Obtained License
1953-06-03 Direction Drilling Operation Performed - 98
1953-06-15 Finished Drilling
1953-06-15 Well Mode changed to Drilled and Cased
1953-06-16 Drill Stem Test Performed
1953-06-17 Production Casing Operation Performed
1953-06-28 Perforation Treatment Performed - Jet Perforation
1953-07-06 Well Began Production
1953-07-06 Well Fluid changed to Crude Oil
1953-07-06 Well Mode changed to Flowing
1959-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-14 Perforation Treatment Performed - Cement Squeeze
1959-07-17 Perforation Treatment Performed - Bullet Perforation
1959-08-20 Perforation Treatment Performed - Bullet Perforation
1959-09-28 Perforation Treatment Performed - Bullet Perforation
1959-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-21 Well Fluid changed to Crude Oil
1959-11-21 Well Mode changed to Pumping
1960-01-16 Perforation Treatment Performed - Bullet Perforation
1965-07-27 Perforation Treatment Performed - Cement Plug
1965-08-03 Well Abandoned
1965-08-03 Well Fluid changed to Crude Oil
1965-08-03 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1953-06-03 457.20 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-06-28 Perforation 1012.90 1013.50 13
1959-07-14 Acid Treatment 1012.90 1013.50 0
1959-07-14 Cement Squeeze 1012.90 1013.50 0
1959-07-17 Bullet Perforation 1016.80 1018.30 13
1959-08-20 Bullet Perforation 1015.90 1017.10 13
1959-09-28 Bullet Perforation 1014.70 1015.90 13
1959-11-21 Acid Treatment 1014.70 1018.30 0
1960-01-16 Bullet Perforation 1013.20 1014.70 13
1965-07-27 Cement Plug 989.10 1019.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[6]

References