X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484192210003

Well Details

Well ID: 0484192210003
Loading map...
Location: 00/10-22-048-19W4/3
Location Alias: 00/10-22-48-19 W4M
Location Alias 2: 00/10-22-048-19 W4/03
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 19
Section: 22
County/Municipality: Camrose County
Well Name: CALPINE DEMAY 10-22-48-19
Operator Name: Calpine Canada Resources Company
License Number: 0142262
License Date: 1989-12-19
License Status: RecCertified
Spud Date: 1989-12-22
Final Drill Date: 1989-12-29
Well Total Depth: 1150.00 m
Surface Hole Latitude: 53.159198
Surface Hole Longitude: -112.691300

For data sources see[1][2]

Well History

Date Event
1989-12-19 Obtained License
1989-12-23 Surface Casing Operation Performed
1989-12-29 Finished Drilling
1989-12-29 Well Log Performed
1989-12-29 Well Mode changed to Drilled and Cased
1989-12-30 Drill Stem Test Performed
1989-12-30 Well Log Performed
1989-12-31 Production Casing Operation Performed
1990-01-01 Rig Released
1990-01-29 Perforation Treatment Performed - Jet Perforation
1990-01-29 Well Log Performed
1990-08-23 Perforation Treatment Performed - Bridge Plug No Cement Required
1990-08-23 Perforation Treatment Performed - Jet Perforation
1990-08-23 Well Log Performed
1990-10-05 Perforation Treatment Performed - Jet Perforation
1990-10-05 Well Log Performed
1991-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-05-23 Perforation Treatment Performed - Jet Perforation
1991-05-23 Plug Back Performed
1991-05-23 Well Began Production
1991-05-23 Well Fluid changed to Gas
1991-05-23 Well Log Performed
1991-05-23 Well Mode changed to Flowing
1991-08-27 Well Fluid changed to Gas
1991-08-27 Well Mode changed to Suspended
1992-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-02 Plug Back Performed
1992-09-02 Well Fluid changed to Gas
1992-09-02 Well Log Performed
1992-09-02 Well Mode changed to Abandoned
1992-09-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-01-29 Perforation 1094.90 1095.90 13
1990-08-23 Bridge Plug, No Cement 1093.00 1093.00 0
1990-08-23 Perforation 1086.30 1087.80 13
1990-10-05 Perforation 1086.30 1089.00 13
1991-05-23 Packing Device Capped w/Cement 1074.00 1082.00 0
1991-05-23 Perforation 1060.80 1061.80 13
1992-09-02 Packing Device Capped w/Cement 1043.00 1051.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1682 0.0 0.0 0.0

For data sources see[5]

References