X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484143210002

Well Details

Well ID: 0484143210002
Loading map...
Location: 00/10-32-048-14W4/2
Location Alias: 00/10-32-48-14 W4M
Location Alias 2: 00/10-32-048-14 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 14
Section: 32
County/Municipality: Beaver County
Well Name: SPL BRUCE 10-32-48-14
Operator Name: Spur Petroleum Ltd.
License Number: 0295213
License Date: 2003-10-30
License Status: Suspension
Spud Date: 2003-11-01
Final Drill Date: 2003-11-03
Well Total Depth: 915.00 m
Surface Hole Latitude: 53.186602
Surface Hole Longitude: -112.014119

For data sources see[1][2]

Well History

Date Event
2003-10-30 Obtained License
2003-11-02 Surface Casing Operation Performed
2003-11-03 Finished Drilling
2003-11-03 Lost Circulation Occurred
2003-11-03 Well Log Performed
2003-11-03 Well Mode changed to Drilled and Cased
2003-11-06 Production Casing Operation Performed
2003-11-06 Rig Released
2003-11-06 Well Log Performed
2003-11-19 Well Log Performed
2003-11-20 Perforation Treatment Performed - Jet Perforation
2003-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-28 Perforation Treatment Performed - Jet Perforation
2003-11-28 Plug Back Performed
2003-11-28 Well Log Performed
2003-12-02 Well Fluid changed to Gas
2003-12-02 Well Mode changed to Testing
2004-02-17 Perforation Treatment Performed - Fractured
2004-10-08 Well Began Production
2004-10-08 Well Fluid changed to Gas
2004-10-08 Well Mode changed to Flowing
2009-06-25 Well Fluid changed to Gas
2009-06-25 Well Mode changed to Suspended
2017-01-12 Well Fluid changed to Gas
2017-01-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-11-20 Perforation 799.00 810.00 17
2003-11-28 Packing Device Capped w/Cement 787.00 795.00 0
2003-11-28 Perforation 749.00 751.50 17
2004-02-17 Fracture 749.00 751.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 49 0.0 0.0 0.0
2004 1992 0.0 0.0 0.0
2005 5050 0.0 0.0 0.0
2006 5883 0.0 0.0 0.0
2007 3830 0.0 0.0 0.0
2008 6836 0.0 0.0 0.0
2009 967 0.0 0.0 0.0
2017 8419 0.0 0.0 0.0
2018 7179 0.0 0.0 0.0
2019 8471 0.0 0.0 0.0
2020 2039 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-11-03 Lost Circulation 874.00 874.00

For data sources see[6]

References