If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484141511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.142282,"lon":-111.967322,"icon":""}]} |
Location: 00/11-15-048-14W4/0 | |
Location Alias: 00/11-15-48-14 W4M | |
Location Alias 2: 00/11-15-048-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 14 | |
Section: 15 | |
County/Municipality: Beaver County | |
Well Name: SPL BRUCE 11-15-48-14 | |
Operator Name: Spur Petroleum Ltd. | |
License Number: 0288699 | |
License Date: 2003-06-19 | |
License Status: Issued | |
Spud Date: 2003-07-03 | |
Final Drill Date: 2003-07-04 | |
Well Total Depth: 900.00 m | |
Surface Hole Latitude: 53.142282 | |
Surface Hole Longitude: -111.967322 |
Date | Event |
---|---|
2003-06-19 | Obtained License |
2003-07-02 | Surface Casing Operation Performed |
2003-07-04 | Finished Drilling |
2003-07-04 | Well Log Performed |
2003-07-04 | Well Mode changed to Drilled and Cased |
2003-07-05 | Production Casing Operation Performed |
2003-07-05 | Rig Released |
2003-07-29 | Perforation Treatment Performed - Jet Perforation |
2003-07-30 | Well Log Performed |
2003-08-03 | Well Fluid changed to Gas |
2003-08-03 | Well Mode changed to Testing |
2003-08-12 | Perforation Treatment Performed - Jet Perforation |
2003-08-13 | Well Log Performed |
2003-09-19 | Perforation Treatment Performed - Jet Perforation |
2003-09-20 | Well Log Performed |
2003-09-22 | Perforation Treatment Performed - Cement Squeeze |
2003-09-25 | Perforation Treatment Performed - Jet Perforation |
2003-09-26 | Well Log Performed |
2003-11-06 | Well Began Production |
2003-11-06 | Well Fluid changed to Gas |
2003-11-06 | Well Mode changed to Flowing |
2005-05-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-05-08 | Plug Back Performed |
2005-05-08 | Well Fluid changed to Gas |
2005-05-08 | Well Log Performed |
2005-05-08 | Well Mode changed to Abandoned Zone |
2005-09-05 | Well Log Performed |
2005-09-08 | Well Log Performed |
2005-09-28 | Well Log Performed |
2005-10-24 | Perforation Treatment Performed - Jet Perforation |
2005-10-24 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-07-29 | Perforation | 834.20 | 834.40 | 2 |
2005-10-24 | Perforation | 739.00 | 742.00 | 17 |
2003-07-29 | Perforation | 834.00 | 835.50 | 17 |
2003-08-12 | Perforation | 813.00 | 815.00 | 17 |
2003-09-19 | Perforation | 289.00 | 290.00 | 7 |
2003-09-22 | Cement Squeeze | 289.00 | 290.00 | 0 |
2003-09-25 | Perforation | 811.90 | 812.10 | 2 |
2003-09-25 | Perforation | 811.00 | 813.00 | 2 |
2005-05-08 | Packing Device Capped w/Cement | 822.80 | 830.80 | 0 |
2005-05-08 | Packing Device Capped w/Cement | 801.00 | 809.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 1360 | 0.0 | 0.0 | 0.0 |
2004 | 4741 | 0.0 | 0.0 | 0.0 |
2005 | 749 | 0.0 | 0.0 | 0.0 |
For data sources see[5]