X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484141511000

Well Details

Well ID: 0484141511000
Loading map...
Location: 00/11-15-048-14W4/0
Location Alias: 00/11-15-48-14 W4M
Location Alias 2: 00/11-15-048-14 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 14
Section: 15
County/Municipality: Beaver County
Well Name: SPL BRUCE 11-15-48-14
Operator Name: Spur Petroleum Ltd.
License Number: 0288699
License Date: 2003-06-19
License Status: Issued
Spud Date: 2003-07-03
Final Drill Date: 2003-07-04
Well Total Depth: 900.00 m
Surface Hole Latitude: 53.142282
Surface Hole Longitude: -111.967322

For data sources see[1][2]

Well History

Date Event
2003-06-19 Obtained License
2003-07-02 Surface Casing Operation Performed
2003-07-04 Finished Drilling
2003-07-04 Well Log Performed
2003-07-04 Well Mode changed to Drilled and Cased
2003-07-05 Production Casing Operation Performed
2003-07-05 Rig Released
2003-07-29 Perforation Treatment Performed - Jet Perforation
2003-07-30 Well Log Performed
2003-08-03 Well Fluid changed to Gas
2003-08-03 Well Mode changed to Testing
2003-08-12 Perforation Treatment Performed - Jet Perforation
2003-08-13 Well Log Performed
2003-09-19 Perforation Treatment Performed - Jet Perforation
2003-09-20 Well Log Performed
2003-09-22 Perforation Treatment Performed - Cement Squeeze
2003-09-25 Perforation Treatment Performed - Jet Perforation
2003-09-26 Well Log Performed
2003-11-06 Well Began Production
2003-11-06 Well Fluid changed to Gas
2003-11-06 Well Mode changed to Flowing
2005-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-08 Plug Back Performed
2005-05-08 Well Fluid changed to Gas
2005-05-08 Well Log Performed
2005-05-08 Well Mode changed to Abandoned Zone
2005-09-05 Well Log Performed
2005-09-08 Well Log Performed
2005-09-28 Well Log Performed
2005-10-24 Perforation Treatment Performed - Jet Perforation
2005-10-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-07-29 Perforation 834.20 834.40 2
2005-10-24 Perforation 739.00 742.00 17
2003-07-29 Perforation 834.00 835.50 17
2003-08-12 Perforation 813.00 815.00 17
2003-09-19 Perforation 289.00 290.00 7
2003-09-22 Cement Squeeze 289.00 290.00 0
2003-09-25 Perforation 811.90 812.10 2
2003-09-25 Perforation 811.00 813.00 2
2005-05-08 Packing Device Capped w/Cement 822.80 830.80 0
2005-05-08 Packing Device Capped w/Cement 801.00 809.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1360 0.0 0.0 0.0
2004 4741 0.0 0.0 0.0
2005 749 0.0 0.0 0.0

For data sources see[5]

References