X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484140905000

Well Details

Well ID: 0484140905000
Loading map...
Location: 00/05-09-048-14W4/0
Location Alias: 00/05-09-48-14 W4M
Location Alias 2: 00/05-09-048-14 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 14
Section: 09
County/Municipality: Beaver County
Well Name: PEOC BRUCE 5-9-48-14
Operator Name: Sequoia Resources Corp.
License Number: 0239843
License Date: 2000-07-18
License Status: Abandoned
Spud Date: 2000-07-25
Final Drill Date: 2000-07-27
Well Total Depth: 876.80 m
Surface Hole Latitude: 53.122881
Surface Hole Longitude: -112.001880

For data sources see[1][2]

Well History

Date Event
2000-07-18 Obtained License
2000-07-25 Surface Casing Operation Performed
2000-07-27 Finished Drilling
2000-07-27 Rig Released
2000-07-27 Well Log Performed
2000-07-27 Well Mode changed to Drilled and Cased
2000-08-27 Production Casing Operation Performed
2000-08-28 Perforation Treatment Performed - Jet Perforation
2000-08-29 Well Log Performed
2000-09-09 Well Began Production
2000-09-09 Well Fluid changed to Gas
2000-09-09 Well Mode changed to Flowing
2000-10-09 Well Log Performed
2000-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-10 Perforation Treatment Performed - Jet Perforation
2000-10-10 Plug Back Performed
2000-10-10 Well Fluid changed to Gas
2000-10-10 Well Log Performed
2000-10-10 Well Mode changed to Abandoned Zone
2000-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-11 Perforation Treatment Performed - Jet Perforation
2000-10-11 Plug Back Performed
2004-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-22 Plug Back Performed
2004-03-22 Well Abandoned
2004-03-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-28 Perforation 849.50 850.50 13
2000-08-28 Perforation 712.00 713.50 13
2000-10-10 Packing Device Capped w/Cement 837.00 845.00 0
2000-10-10 Perforation 828.00 829.00 13
2000-10-10 Packing Device Capped w/Cement 819.00 827.00 0
2000-10-11 Perforation 797.00 798.00 13
2000-10-11 Perforation 791.00 792.50 13
2000-10-11 Packing Device Capped w/Cement 780.00 788.00 0
2004-03-22 Packing Device Capped w/Cement 695.00 703.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 30 0.0 0.0 0.0

For data sources see[5]

References