X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484131015003

Well Details

Well ID: 0484131015003
Loading map...
Location: 00/15-10-048-13W4/3
Location Alias: 00/15-10-48-13 W4M
Location Alias 2: 00/15-10-048-13 W4/03
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 13
Section: 10
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 15-10-48-13
Operator Name: Pine Cliff Energy Ltd.
License Number: 0135617
License Date: 1988-08-17
License Status: Issued
Spud Date: 1988-08-27
Final Drill Date: 1988-08-29
Well Total Depth: 877.00 m
Surface Hole Latitude: 53.129366
Surface Hole Longitude: -111.819976

For data sources see[1][2]

Well History

Date Event
1988-08-17 Obtained License
1988-08-27 Surface Casing Operation Performed
1988-08-29 Finished Drilling
1988-08-29 Well Log Performed
1988-08-29 Well Mode changed to Drilled and Cased
1988-08-30 Production Casing Operation Performed
1988-08-30 Rig Released
1988-09-08 Well Log Performed
1988-09-09 Well Log Performed
1988-09-11 Well Log Performed
1988-09-12 Perforation Treatment Performed - Jet Perforation
1988-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-19 Plug Back Performed
2008-12-19 Well Log Performed
2008-12-20 Perforation Treatment Performed - Jet Perforation
2008-12-20 Well Log Performed
2009-01-07 Perforation Treatment Performed - Fractured
2009-01-14 Well Log Performed
2009-01-15 Perforation Treatment Performed - Jet Perforation
2009-04-01 Well Began Production
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-12 Perforation 807.00 809.00 13
1988-09-13 Acid Treatment 807.00 809.00 0
2008-12-19 Packing Device Capped w/Cement 797.00 805.00 0
2008-12-20 Perforation 670.50 677.00 17
2009-01-07 Fracture 670.50 677.00 0
2009-01-15 Perforation 777.00 780.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6583 0.0 0.0 0.0
2010 8560 0.0 0.0 0.0
2011 8724 0.0 0.0 0.0
2012 8751 0.0 0.0 0.0
2013 8400 0.0 0.0 0.0
2014 8633 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8275 0.0 0.0 0.0
2017 7964 0.0 0.0 0.0
2018 5235 0.0 0.0 0.0
2019 8618 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References