X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484113414004

Well Details

Well ID: 0484113414004
Loading map...
Location: 00/14-34-048-11W4/4
Location Alias: 00/14-34-48-11 W4M
Location Alias 2: 00/14-34-048-11 W4/04
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 11
Section: 34
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 14-34-48-11
Operator Name: Pine Cliff Energy Ltd.
License Number: 0270894
License Date: 2002-06-14
License Status: Amended
Spud Date: 2002-06-24
Final Drill Date: 2002-06-25
Well Total Depth: 797.00 m
Surface Hole Latitude: 53.189946
Surface Hole Longitude: -111.531491

For data sources see[1][2]

Well History

Date Event
2002-06-14 Obtained License
2002-06-25 Finished Drilling
2002-06-25 Surface Casing Operation Performed
2002-06-25 Well Log Performed
2002-06-25 Well Mode changed to Drilled and Cased
2002-06-26 Production Casing Operation Performed
2002-06-26 Rig Released
2002-06-30 Perforation Treatment Performed - Jet Perforation
2002-06-30 Well Log Performed
2002-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-09 Perforation Treatment Performed - Jet Perforation
2002-07-09 Plug Back Performed
2002-07-09 Well Log Performed
2002-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-10 Perforation Treatment Performed - Jet Perforation
2002-07-10 Plug Back Performed
2002-07-10 Well Log Performed
2003-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-12 Plug Back Performed
2003-03-13 Perforation Treatment Performed - Jet Perforation
2003-03-13 Well Log Performed
2003-03-25 Well Began Production
2003-03-25 Well Fluid changed to Gas
2003-03-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-30 Perforation 768.00 769.00 20
2002-07-09 Packing Device Capped w/Cement 752.00 760.00 0
2002-07-09 Perforation 696.00 698.00 20
2002-07-10 Packing Device Capped w/Cement 682.00 690.00 0
2002-07-10 Perforation 653.50 656.00 20
2003-03-12 Packing Device Capped w/Cement 639.00 647.00 0
2003-03-13 Perforation 613.00 616.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 6436 0.0 0.0 0.0
2004 8664 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8320 0.0 0.0 0.0
2007 8256 0.0 0.0 0.0
2008 7979 0.0 0.0 0.0
2009 5668 0.0 0.0 0.0
2010 7266 0.0 0.0 0.0
2011 8327 0.0 0.0 0.0
2012 8543 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8592 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References