X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484112511002

Well Details

Well ID: 0484112511002
Loading map...
Location: 00/11-25-048-11W4/2
Location Alias: 00/11-25-48-11 W4M
Location Alias 2: 00/11-25-048-11 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 11
Section: 25
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 11-25-48-11
Operator Name: Pine Cliff Energy Ltd.
License Number: 0270900
License Date: 2002-06-14
License Status: Amended
Spud Date: 2002-06-26
Final Drill Date: 2002-06-28
Well Total Depth: 823.00 m
Surface Hole Latitude: 53.169273
Surface Hole Longitude: -111.481776

For data sources see[1][2]

Well History

Date Event
2002-06-14 Obtained License
2002-06-26 Surface Casing Operation Performed
2002-06-28 Finished Drilling
2002-06-28 Production Casing Operation Performed
2002-06-28 Rig Released
2002-06-28 Well Log Performed
2002-06-28 Well Mode changed to Drilled and Cased
2002-07-04 Perforation Treatment Performed - Jet Perforation
2002-07-04 Well Log Performed
2002-07-05 Perforation Treatment Performed - Jet Perforation
2002-07-07 Perforation Treatment Performed - Jet Perforation
2002-07-07 Well Log Performed
2002-08-06 Well Began Production
2002-08-06 Well Fluid changed to Gas
2002-08-06 Well Mode changed to Flowing
2003-03-01 Well Fluid changed to Gas
2003-03-01 Well Mode changed to Suspended
2003-03-18 Perforation Treatment Performed - Jet Perforation
2003-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-19 Plug Back Performed
2003-03-19 Well Fluid changed to Gas
2003-03-19 Well Log Performed
2003-03-19 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-04 Perforation 800.20 802.20 20
2002-07-05 Perforation 751.00 752.50 20
2002-07-07 Perforation 748.50 749.50 20
2003-03-18 Perforation 643.00 648.00 17
2003-03-19 Packing Device Capped w/Cement 732.00 740.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1835 0.0 0.0 0.0
2003 672 0.0 0.0 0.0

For data sources see[5]

References