X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484111712000

Well Details

Well ID: 0484111712000
Loading map...
Location: 00/12-17-048-11W4/0
Location Alias: 00/12-17-48-11 W4M
Location Alias 2: 00/12-17-048-11 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 11
Section: 17
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 12-17-48-11
Operator Name: Pine Cliff Energy Ltd.
License Number: 0184652
License Date: 1996-01-16
License Status: Issued
Spud Date: 1996-07-08
Final Drill Date: 1996-07-11
Well Total Depth: 841.00 m
Surface Hole Latitude: 53.140172
Surface Hole Longitude: -111.587564

For data sources see[1][2]

Well History

Date Event
1996-01-16 Obtained License
1996-07-09 Surface Casing Operation Performed
1996-07-11 Finished Drilling
1996-07-11 Well Log Performed
1996-07-11 Well Mode changed to Drilled and Cased
1996-07-12 Production Casing Operation Performed
1996-07-12 Rig Released
1996-07-20 Perforation Treatment Performed - Open-Hole Completion
1996-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-21 Perforation Treatment Performed - Jet Perforation
1996-07-21 Plug Back Performed
1996-07-21 Well Log Performed
1996-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-22 Perforation Treatment Performed - Jet Perforation
1996-07-22 Plug Back Performed
1996-07-23 Perforation Treatment Performed - Jet Perforation
1996-08-27 Well Began Production
1996-08-27 Well Fluid changed to Gas
1996-08-27 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-20 Open Hole/Barefoot Completion 819.00 841.00 0
1996-07-21 Packing Device Capped w/Cement 794.00 802.00 0
1996-07-21 Perforation 772.00 778.00 20
1996-07-22 Packing Device Capped w/Cement 762.00 770.00 0
1996-07-22 Perforation 753.50 755.00 20
1996-07-23 Perforation 712.80 714.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2925 0.0 0.0 0.0
1997 8748 0.0 0.0 0.0
1998 8715 0.0 0.0 0.0
1999 8727 0.0 0.0 0.0
2000 8736 0.0 0.0 0.0
2001 8680 0.0 0.0 0.0
2002 8662 0.0 0.0 0.0
2003 8719 0.0 0.0 0.0
2004 8743 0.0 0.0 0.0
2005 8746 0.0 0.0 0.0
2006 8745 0.0 0.0 0.0
2007 8720 0.0 0.0 0.0
2008 8779 0.0 0.0 0.0
2009 8713 0.0 0.0 0.0
2010 8582 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References