X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484081802D00

Well Details

Well ID: 0484081802D00
Loading map...
Location: D0/02-18-048-08W4/0
Location Alias: D0/02-18-48-08 W4M
Location Alias 2: D0/02-18-048-08 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 08
Section: 18
County/Municipality: County of Minburn No. 27
Well Name: HARVEST 2D VIK-KINS 2-18-48-8
Operator Name: Cardinal Energy Ltd.
License Number: 0055762
License Date: 1975-11-10
License Status: Abandoned
Spud Date: 1975-11-15
Final Drill Date: 1975-11-18
Well Total Depth: 699.20 m
Surface Hole Latitude: 53.134962
Surface Hole Longitude: -111.158407

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-10 Obtained License
1975-11-18 Drill Stem Test Performed
1975-11-18 Finished Drilling
1975-11-18 Well Mode changed to Drilled and Cased
1975-11-19 Production Casing Operation Performed
1975-11-20 Perforation Treatment Performed - Jet Perforation
1975-11-21 Perforation Treatment Performed - Fractured
1975-12-02 Well Began Production
1975-12-02 Well Fluid changed to Crude Oil
1975-12-02 Well Mode changed to Pumping
1987-07-01 Well Fluid changed to Crude Oil
1987-07-01 Well Mode changed to Suspended
1988-01-01 Well Fluid changed to Crude Oil
1988-01-01 Well Mode changed to Pumping
1995-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-25 Plug Back Performed
1995-10-25 Well Fluid changed to Crude Oil
1995-10-25 Well Mode changed to Abandoned Zone
1995-10-27 Perforation Treatment Performed - Cement Plug
1996-04-08 Well Abandoned
1996-04-08 Well Fluid changed to Crude Oil
1996-04-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-20 Perforation 686.70 687.90 7
1975-11-21 Fracture 686.70 687.90 0
1995-10-25 Packing Device Capped w/Cement 674.00 682.00 0
1995-10-27 Cement Plug 161.00 247.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 506 0.0 0.0 0.0
1976 5187 0.0 0.0 0.0
1977 7775 0.0 0.0 0.0
1978 8473 0.0 0.0 0.0
1979 8449 0.0 0.0 0.0
1980 8531 0.0 0.0 0.0
1981 8645 0.0 0.0 0.0
1982 8588 0.0 0.0 0.0
1983 8477 0.0 0.0 0.0
1984 8381 0.0 0.0 0.0
1985 8321 0.0 0.0 0.0
1986 1479 0.0 0.0 0.0
1988 8625 0.0 0.0 0.0
1989 7915 0.0 0.0 0.0
1990 4088 0.0 0.0 0.0
1992 2910 0.0 0.0 0.0
1993 8026 0.0 0.0 0.0
1994 8044 0.0 0.0 0.0
1995 4056 0.0 0.0 0.0
1996 744 0.0 0.0 0.0

For data sources see[5]

References