X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484081506000

Well Details

Well ID: 0484081506000
Loading map...
Location: 00/06-15-048-08W4/0
Location Alias: 00/06-15-48-08 W4M
Location Alias 2: 00/06-15-048-08 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 08
Section: 15
County/Municipality: County of Minburn No. 27
Well Name: PVR VIK-KINS 6-15-48-8
Operator Name: Canadian Natural Resources Limited
License Number: 0238479
License Date: 2000-06-13
License Status: Issued
Spud Date: 2000-06-23
Final Drill Date: 2000-06-26
Well Total Depth: 834.00 m
Surface Hole Latitude: 53.135848
Surface Hole Longitude: -111.091350

For data sources see[1][2]

Well History

Date Event
2000-06-13 Obtained License
2000-06-19 Well Log Performed
2000-06-24 Direction Drilling Operation Performed - Deviate
2000-06-24 Surface Casing Operation Performed
2000-06-26 Finished Drilling
2000-06-26 Well Log Performed
2000-06-27 Production Casing Operation Performed
2000-06-27 Rig Released
2000-06-27 Well Mode changed to Drilled and Cased
2000-07-04 Well Log Performed
2000-07-20 Perforation Treatment Performed - Jet Perforation
2000-08-03 Perforation Treatment Performed - Fractured
2000-08-16 Well Began Production
2000-08-16 Well Fluid changed to Crude Oil
2000-08-16 Well Mode changed to Pumping
2001-03-07 Well Log Performed
2001-04-06 Well Began Injection
2001-04-06 Well Fluid changed to Water
2001-04-06 Well Type changed to Injection
2003-08-25 Perforation Treatment Performed - Chemical Squeeze
2019-08-31 Well Fluid changed to Water
2019-08-31 Well Mode changed to Suspended
2019-08-31 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-06-24 150.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-07-20 Perforation 740.00 744.00 17
2000-08-03 Fracture 740.00 744.00 0
2003-08-25 Chemical Squeeze 740.00 744.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 2668 0.0 0.0 0.0
2001 1448 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[6]

References