X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484053016000

Well Details

Well ID: 0484053016000
Loading map...
Location: 00/16-30-048-05W4/0
Location Alias: 00/16-30-48-05 W4M
Location Alias 2: 00/16-30-048-05 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 05
Section: 30
County/Municipality: County of Vermilion River
Well Name: NORTHROCK ETAL WILDMERE 16-30-48-5
Operator Name: TAQA North Ltd.
License Number: 0197586
License Date: 1997-02-04
License Status: RecCertified
Spud Date: 1997-02-15
Final Drill Date: 1997-02-19
Well Total Depth: 658.00 m
Surface Hole Latitude: 53.172352
Surface Hole Longitude: -110.717355

For data sources see[1][2]

Well History

Date Event
1997-02-04 Obtained License
1997-02-15 Surface Casing Operation Performed
1997-02-18 Direction Drilling Operation Performed - Deviate
1997-02-19 Finished Drilling
1997-02-19 Well Log Performed
1997-02-19 Well Mode changed to Drilled and Cased
1997-02-20 Production Casing Operation Performed
1997-02-20 Rig Released
1997-02-25 Well Log Performed
1997-03-25 Perforation Treatment Performed - Jet Perforation
1997-03-25 Well Log Performed
1997-04-01 Perforation Treatment Performed - Jet Perforation
1997-04-02 Perforation Treatment Performed - Jet Perforation
1997-04-03 Perforation Treatment Performed - Jet Perforation
1997-04-03 Well Log Performed
1997-04-09 Perforation Treatment Performed - Fractured
1997-05-02 Well Began Production
1997-05-02 Well Fluid changed to Crude Oil
1997-05-02 Well Mode changed to Pumping
1997-11-25 Perforation Treatment Performed - Jet Perforation
1998-08-01 Well Log Performed
1998-08-25 Perforation Treatment Performed - Jet Perforation
1998-08-25 Perforation Treatment Performed - Remedial Casing
2000-08-29 Perforation Treatment Performed - Jet Perforation
2000-08-31 Perforation Treatment Performed - Remedial Casing
2000-09-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2000-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-12 Perforation Treatment Performed - Acid Wash - No Pressure
2000-09-12 Perforation Treatment Performed - Remedial Casing
2000-09-14 Perforation Treatment Performed - Remedial Casing
2000-12-01 Well Fluid changed to Crude Oil
2000-12-01 Well Mode changed to Suspended
2006-01-10 Well Fluid changed to Crude Oil
2006-01-10 Well Mode changed to Abandoned Zone
2006-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-01 Plug Back Performed
2006-10-06 Well Abandoned
2006-10-06 Well Fluid changed to Crude Oil
2006-10-06 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-02-18 94.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-25 Perforation 634.00 637.00 20
2000-08-29 Perforation 225.00 225.60 80
2000-08-31 Remedial Casing Cementing 225.00 225.60 0
2000-09-11 Hydra Jet Perforation 324.00 324.50 0
2000-09-12 Acid Wash 324.00 324.50 0
2000-09-12 Acid Treatment 324.00 324.50 0
2000-09-12 Remedial Casing Cementing 324.00 324.50 0
2000-09-14 Remedial Casing Cementing 225.00 225.60 0
2006-10-01 Packing Device Capped w/Cement 39.70 47.70 0
1997-04-01 Perforation 620.50 622.50 20
1997-04-02 Perforation 561.70 564.00 20
1997-04-03 Perforation 561.30 564.30 20
1997-04-09 Fracture 561.30 564.30 0
1997-11-25 Perforation 560.00 566.00 20
1998-08-25 Perforation 240.00 241.00 13
1998-08-25 Perforation 250.00 251.00 13
1998-08-25 Remedial Casing Cementing 240.00 251.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3497 0.0 0.0 0.0

For data sources see[6]

References