Well ID: 0484052704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.163547,"lon":-110.66255,"icon":""}]} |
Location: 00/04-27-048-05W4/0 | |
Location Alias: 00/04-27-48-05 W4M | |
Location Alias 2: 00/04-27-048-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 05 | |
Section: 27 | |
County/Municipality: County of Vermilion River | |
Well Name: HUSKY NORCEN WILDMERE 4C-27-48-5 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0119725 | |
License Date: 1985-11-27 | |
License Status: Abandoned | |
Spud Date: 1985-12-10 | |
Final Drill Date: 1985-12-12 | |
Well Total Depth: 681.90 m | |
Surface Hole Latitude: 53.163547 | |
Surface Hole Longitude: -110.662550 |
Date | Event |
---|---|
1985-11-27 | Obtained License |
1985-12-11 | Surface Casing Operation Performed |
1985-12-12 | Finished Drilling |
1985-12-13 | Plug Back Performed |
1985-12-13 | Well Log Performed |
1985-12-14 | Plug Back Performed |
1985-12-14 | Rig Released |
1985-12-14 | Well Abandoned |
1985-12-14 | Well Mode changed to Abandoned |
2013-12-01 | Well Log Performed |
2013-12-11 | Production Casing Operation Performed |
2014-02-09 | Well Log Performed |
2014-06-12 | Well Log Performed |
2014-06-14 | Perforation Treatment Performed - Jet Perforation |
2014-06-14 | Well Log Performed |
2014-07-02 | Perforation Treatment Performed - Cement Plug |
2014-07-02 | Perforation Treatment Performed - Remedial Casing |
2014-07-02 | Plug Back Performed |
2014-07-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-07-03 | Perforation Treatment Performed - Jet Perforation |
2014-07-03 | Plug Back Performed |
2014-07-03 | Well Log Performed |
2014-07-04 | Perforation Treatment Performed - Cement Plug |
2014-07-04 | Perforation Treatment Performed - Remedial Casing |
2014-07-04 | Plug Back Performed |
2014-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-07-08 | Perforation Treatment Performed - Jet Perforation |
2014-07-08 | Plug Back Performed |
2014-07-08 | Well Log Performed |
2014-07-09 | Perforation Treatment Performed - Cement Plug |
2014-07-09 | Perforation Treatment Performed - Remedial Casing |
2014-07-09 | Plug Back Performed |
2014-07-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-07-14 | Perforation Treatment Performed - Jet Perforation |
2014-07-14 | Plug Back Performed |
2014-07-14 | Well Log Performed |
2014-07-16 | Perforation Treatment Performed - Cement Plug |
2014-07-16 | Perforation Treatment Performed - Remedial Casing |
2014-07-16 | Plug Back Performed |
2014-07-17 | Well Log Performed |
2014-07-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-07-22 | Perforation Treatment Performed - Jet Perforation |
2014-07-22 | Plug Back Performed |
2014-07-22 | Well Log Performed |
2014-07-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-07-29 | Perforation Treatment Performed - Cement Plug |
2014-07-29 | Perforation Treatment Performed - Remedial Casing |
2014-07-29 | Plug Back Performed |
2016-11-03 | Well Log Performed |
2016-11-24 | Perforation Treatment Performed - Cement Plug |
2016-11-24 | Plug Back Performed |
2016-11-25 | Perforation Treatment Performed - Jet Perforation |
2016-11-25 | Well Log Performed |
2016-11-26 | Perforation Treatment Performed - Remedial Casing |
2016-11-27 | Perforation Treatment Performed - Jet Perforation |
2016-11-27 | Well Log Performed |
2016-11-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-11-28 | Perforation Treatment Performed - Cement Plug |
2016-11-28 | Perforation Treatment Performed - Remedial Casing |
2016-11-28 | Plug Back Performed |
2017-09-25 | Well Log Performed |
2017-11-10 | Perforation Treatment Performed - Cement Plug |
2017-11-10 | Plug Back Performed |
2017-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-11-12 | Perforation Treatment Performed - Jet Perforation |
2017-11-12 | Plug Back Performed |
2017-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-11-13 | Perforation Treatment Performed - Cement Plug |
2017-11-13 | Perforation Treatment Performed - Remedial Casing |
2017-11-13 | Plug Back Performed |
2017-11-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-11-14 | Perforation Treatment Performed - Cement Plug |
2017-11-14 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-06-14 | Perforation | 518.10 | 519.10 | 99 |
2014-07-08 | Perforation | 428.50 | 429.50 | 17 |
2014-07-08 | Perforation | 428.50 | 429.50 | 20 |
2014-07-09 | Remedial Casing Cementing | 428.50 | 429.50 | 0 |
2014-07-09 | Cement Plug | 426.20 | 429.50 | 0 |
2014-07-14 | Packing Device Capped w/Cement | 417.00 | 425.00 | 0 |
2014-07-14 | Perforation | 319.00 | 322.00 | 20 |
2014-07-16 | Remedial Casing Cementing | 319.00 | 322.00 | 0 |
2014-07-16 | Cement Plug | 316.20 | 322.00 | 0 |
2014-07-22 | Packing Device Capped w/Cement | 307.00 | 315.00 | 0 |
2014-07-22 | Perforation | 193.70 | 196.70 | 17 |
2014-07-02 | Remedial Casing Cementing | 518.10 | 519.20 | 0 |
2014-07-29 | Remedial Casing Cementing | 193.70 | 196.70 | 0 |
2014-07-29 | Cement Plug | 192.50 | 196.70 | 0 |
2014-07-29 | Packing Device Capped w/Cement | 183.30 | 191.30 | 0 |
2016-11-24 | Cement Plug | 410.00 | 450.00 | 0 |
2016-11-25 | Perforation | 369.50 | 371.50 | 20 |
2016-11-26 | Remedial Casing Cementing | 369.50 | 371.50 | 0 |
2016-11-27 | Perforation | 229.70 | 231.00 | 20 |
2016-11-28 | Packing Device Capped w/Cement | 300.00 | 365.70 | 0 |
2016-11-28 | Remedial Casing Cementing | 229.70 | 231.00 | 0 |
2016-11-28 | Cement Plug | 218.70 | 226.70 | 0 |
2014-07-02 | Cement Plug | 514.80 | 519.20 | 0 |
2017-11-10 | Cement Plug | 412.90 | 453.60 | 0 |
2017-11-12 | Packing Device Capped w/Cement | 354.00 | 362.00 | 0 |
2017-11-12 | Packing Device Capped w/Cement | 307.00 | 315.00 | 0 |
2017-11-12 | Perforation | 215.00 | 218.00 | 20 |
2017-11-13 | Remedial Casing Cementing | 215.00 | 218.00 | 0 |
2017-11-13 | Cement Plug | 208.50 | 218.00 | 0 |
2017-11-13 | Packing Device Capped w/Cement | 200.00 | 208.00 | 0 |
2017-11-14 | Cement Plug | 186.50 | 200.00 | 0 |
2017-11-14 | Packing Device Capped w/Cement | 178.00 | 186.00 | 0 |
2014-07-03 | Packing Device Capped w/Cement | 506.20 | 514.20 | 0 |
2014-07-03 | Perforation | 468.70 | 469.70 | 17 |
2014-07-03 | Perforation | 468.70 | 469.70 | 20 |
2014-07-04 | Remedial Casing Cementing | 468.70 | 469.70 | 0 |
2014-07-04 | Cement Plug | 464.50 | 469.70 | 0 |
2014-07-08 | Packing Device Capped w/Cement | 455.20 | 463.20 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-30 | No Incident Encountered | 0.00 | 0.00 |
2016-11-24 | No Incident Encountered | 0.00 | 0.00 |
2017-11-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]