If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484011007030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.123361,"lon":-110.063763,"icon":""}]} |
Location: 03/07-10-048-01W4/0 | |
Location Alias: 03/07-10-48-01 W4M | |
Location Alias 2: 03/07-10-048-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 01 | |
Section: 10 | |
County/Municipality: County of Vermilion River | |
Well Name: CNRL 7B LLOYD 7-10-48-1 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0290903 | |
License Date: 2003-08-01 | |
License Status: Suspension | |
Spud Date: 2003-08-15 | |
Final Drill Date: 2003-08-17 | |
Well Total Depth: 634.00 m | |
Surface Hole Latitude: 53.123361 | |
Surface Hole Longitude: -110.063763 |
Date | Event |
---|---|
2003-08-01 | Obtained License |
2003-08-16 | Surface Casing Operation Performed |
2003-08-17 | Finished Drilling |
2003-08-17 | Well Log Performed |
2003-08-17 | Well Mode changed to Drilled and Cased |
2003-08-18 | Production Casing Operation Performed |
2003-08-18 | Rig Released |
2003-10-07 | Well Log Performed |
2003-10-09 | Perforation Treatment Performed - Jet Perforation |
2003-11-16 | Well Began Production |
2003-11-16 | Well Fluid changed to Gas |
2003-11-16 | Well Mode changed to Flowing |
2005-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-27 | Perforation Treatment Performed - Jet Perforation |
2005-07-27 | Plug Back Performed |
2005-07-27 | Well Fluid changed to Gas |
2005-07-27 | Well Mode changed to Abandoned Zone |
2010-09-17 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2010-09-17 | Perforation Treatment Performed - Jet Perforation |
2010-09-17 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-10-09 | Perforation | 604.00 | 605.50 | 20 |
2005-07-27 | Packing Device Capped w/Cement | 593.00 | 601.00 | 0 |
2005-07-27 | Perforation | 523.00 | 524.00 | 17 |
2010-09-17 | Casing Patch | 523.00 | 524.00 | 0 |
2010-09-17 | Perforation | 530.00 | 534.00 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 718 | 0.0 | 0.0 | 0.0 |
2004 | 1756 | 0.0 | 0.0 | 0.0 |
2005 | 168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]