If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475153205002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.086112,"lon":-116.167787,"icon":""}]} |
Location: 00/05-32-047-15W5/2 | |
Location Alias: 00/05-32-47-15 W5M | |
Location Alias 2: 00/05-32-047-15 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 15 | |
Section: 32 | |
County/Municipality: Yellowhead County | |
Well Name: CVE BRAZR 13-29-47-15 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0436329 | |
License Date: 2011-08-25 | |
License Status: Amended | |
Spud Date: 2011-10-10 | |
Final Drill Date: 2011-11-18 | |
Well Total Depth: 4056.00 m | |
Surface Hole Latitude: 53.086112 | |
Surface Hole Longitude: -116.167787 |
Date | Event |
---|---|
2011-08-25 | Obtained License |
2011-10-13 | Surface Casing Operation Performed |
2011-10-22 | Direction Drilling Operation Performed - Horizontal |
2011-11-08 | Direction Drilling Operation Performed - Horizontal |
2011-11-14 | Intermediate Casing Operation Performed |
2011-11-14 | Well Log Performed |
2011-11-18 | Finished Drilling |
2011-11-18 | Well Log Performed |
2011-11-18 | Well Mode changed to Drilled and Cased |
2011-11-20 | Liner Casing Operation Performed |
2011-11-20 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-21 | Rig Released |
2012-02-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-11 | Well Fluid changed to Gas |
2012-02-11 | Well Mode changed to Testing |
2012-02-12 | Well Fluid changed to Gas |
2012-02-12 | Well Mode changed to Test Completed |
2012-03-13 | Well Began Production |
2012-03-13 | Well Fluid changed to Gas |
2012-03-13 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-22 | 2816.00 | Horizontal |
2011-11-08 | 2924.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-20 | Open Hole/Barefoot Completion | 4050.00 | 4056.00 | 0 |
2012-02-05 | Multi-Stage Fracture | 4027.60 | 4028.10 | 0 |
2012-02-05 | Multi-Stage Fracture | 4026.50 | 4027.00 | 0 |
2012-02-05 | Multi-Stage Fracture | 3849.60 | 3850.10 | 0 |
2012-02-05 | Multi-Stage Fracture | 3717.90 | 3718.40 | 0 |
2012-02-05 | Multi-Stage Fracture | 3540.50 | 3541.00 | 0 |
2012-02-05 | Multi-Stage Fracture | 3392.50 | 3393.00 | 0 |
2012-02-05 | Multi-Stage Fracture | 3272.50 | 3273.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7125 | 0.0 | 0.0 | 0.0 |
2013 | 8736 | 0.0 | 0.0 | 0.0 |
2014 | 8519 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8647 | 0.0 | 0.0 | 0.0 |
2017 | 8701 | 0.0 | 0.0 | 0.0 |
2018 | 8520 | 0.0 | 0.0 | 0.0 |
2019 | 8381 | 0.0 | 0.0 | 0.0 |
2020 | 2098 | 0.0 | 0.0 | 0.0 |
For data sources see[6]