X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475152311000

Well Details

Well ID: 0475152311000
Loading map...
Location: 00/11-23-047-15W5/0
Location Alias: 00/11-23-47-15 W5M
Location Alias 2: 00/11-23-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 23
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 11-23-47-15
Operator Name: Cenovus Energy Inc.
License Number: 0111059
License Date: 1984-11-27
License Status: RecCertified
Spud Date: 1984-12-06
Final Drill Date: 1985-01-07
Well Total Depth: 2505.00 m
Surface Hole Latitude: 53.070987
Surface Hole Longitude: -116.090339

For data sources see[1][2]

Well History

Date Event
1984-11-27 Obtained License
1984-12-07 Surface Casing Operation Performed
1985-01-07 Finished Drilling
1985-01-07 Well Mode changed to Drilled and Cased
1985-01-09 Well Log Performed
1985-01-10 Well Log Performed
1985-01-11 Plug Back Performed
1985-01-12 Production Casing Operation Performed
1985-01-12 Rig Released
1985-02-12 Well Log Performed
1985-02-14 Well Log Performed
1985-02-15 Perforation Treatment Performed - Jet Perforation
1985-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-18 Perforation Treatment Performed - Fractured
1985-03-18 Well Began Production
1985-03-18 Well Fluid changed to Crude Oil
1985-03-18 Well Mode changed to Flowing
1985-06-11 Well Fluid changed to Crude Oil
1985-06-11 Well Mode changed to Suspended
1985-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-05 Plug Back Performed
1985-07-05 Well Fluid changed to Crude Oil
1985-07-05 Well Mode changed to Abandoned Zone
1985-07-06 Perforation Treatment Performed - Jet Perforation
1985-07-06 Well Fluid changed to Crude Oil
1985-07-06 Well Mode changed to Abandoned Zone
1985-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-11 Perforation Treatment Performed - Fractured
1985-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-28 Plug Back Performed
1985-08-28 Well Log Performed
1985-08-30 Perforation Treatment Performed - Jet Perforation
1985-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-01 Perforation Treatment Performed - Fractured
2009-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-29 Perforation Treatment Performed - Jet Perforation
2009-09-29 Plug Back Performed
2009-09-29 Well Log Performed
2009-09-30 Perforation Treatment Performed - Jet Perforation
2009-09-30 Perforation Treatment Performed - Remedial Casing
2009-09-30 Well Log Performed
2009-10-01 Perforation Treatment Performed - Remedial Casing
2009-10-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-02-15 Perforation 1898.00 1905.00 13
1985-08-31 Acid Treatment 1759.00 1764.50 0
1985-09-01 Fracture 1759.00 1764.50 0
2009-09-29 Packing Device Capped w/Cement 1738.00 1746.00 0
2009-09-29 Perforation 1135.00 1136.00 20
2009-09-30 Remedial Casing Cementing 1135.00 1136.00 0
2009-09-30 Perforation 606.10 607.10 20
2009-10-01 Remedial Casing Cementing 606.10 607.10 0
1985-02-16 Acid Treatment 1898.00 1905.00 0
1985-02-18 Fracture 1898.00 1905.00 0
1985-07-05 Packing Device Capped w/Cement 1887.00 1895.00 0
1985-07-06 Perforation 1805.00 1811.00 13
1985-07-07 Acid Treatment 1805.00 1811.00 0
1985-07-11 Fracture 1805.00 1810.00 0
1985-08-28 Packing Device Capped w/Cement 1793.00 1801.00 0
1985-08-30 Perforation 1759.00 1764.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1657 0.0 0.0 0.0

For data sources see[5]

References